FeaturesNewsProject Show Case

A12 Landecker Tunnel, Austria, Innsbruck (at/32)

A12 Landecker Tunnel in Austria

Calling enthusiasts to participate in a tender that has been announced for boreholes for geological exploration to be carried out in preparation for the overall project for the A12 Landecker Tunnel, escape and rescue routes, STSG and general renovation. The drilling starting points are in the existing road tunnel, both in the actual traffic area and in the breakdown bays. The drilling lengths are in the range of 40 m to 50 m.

The determined time period for this project is from 01.04.2023 to 30.06.2023.

The related tender documents are attached here.

For further information, please contact:
ASFINAG Construction Management GmbH, attn Eng. Engbert Ulrich
– Tel: +43 664 6010814485
– Email: ulrich.engbert@asfinag.at

What is your reaction?

Excited
0
Happy
0
In Love
0
Not Sure
0
Silly
0

You may also like

Leave a reply

Your email address will not be published. Required fields are marked *

More in:Features