logo
mobileLogo
  • HOME
  • NEWS
    • Second 16.68m TBM completes assembly for Hefei reservoir crossing

      5 days ago
    • Dubai stormwater tunnel

      Dubai advances 10.3km deep-tunnel drainage project

    • Mumbai sewer tunnel TBM

      TERRATEC TBM Completes Mumbai Sewer Tunnel in India

    • Panama Canal tunnel drive completed

      Panama Canal Tunnel Drive Completed by Herrenknecht TBM for Panama Metro’s Line 3

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • 2026 ITA Tunnelling Awards

      2026 ITA Tunnelling Awards recognise global industry achievements

    • HSR Asia 2027

      HSR Asia 2027 to focus on delivering Asia-Pacific’s next generation of high-speed rail

    • Ohio River Tunnel project

      Ohio River Tunnel Project Breaks Ground in Pittsburgh

    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

  • PROJECTS
    • Second Avenue Subway TBM

      First Second Avenue Subway TBM passes Factory Acceptance Test

    • Fehmarnbelt Tunnel German portal

      Structural works completed at German portal of Fehmarnbelt Tunnel

    • Ballard Link tunnel project

      Ballard Link tunnel scheme advances towards environmental review

    • Borumba exploratory tunnelling

      Borumba Exploratory Tunnelling Procurement Suspended in Queensland

  • CONTACT US

Tag: North East Link

North East Link TBMs removed
News

North East Link TBMs Dismantled and Removed from Site

By rosebell
October 29, 2026
North East Link Building
News

Jobs and Careers in the North East Link Building

By rosebell
September 29, 2022
north east link program 2021 NELP highlights
News

Concluding a Successful Year on North East Link

By lyndamyer
December 25, 2021
NELP northern tunnel ventilation structure
News

IREA Scheduled for North East Link Tunnels

By ashleykaren
December 21, 2021
Building A new Sewer Tunnel in North East Link
News

A New Sewer Tunnel in North East Link

By lyndamyer
December 4, 2021
North east link
News

North East Link’s Longer Tunnel

By lyndamyer
November 1, 2021
News

Commencing work with the North East Link

By lyndamyer
June 26, 2021

Posts List

  1. Lima Metro Line 4 breakthrough

    Breakthrough Achieved on Lima Metro Line 4 in Peru

  2. Ohio River Tunnel project

    Ohio River Tunnel Project Breaks Ground in Pittsburgh

  3. India domestic TBM manufacturing

    India Advances Domestic TBM Manufacturing as Rishikesh–Karnaprayag Rail Project Progresses

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • Second 16.68m TBM completes assembly for Hefei reservoir crossing

      5 days ago
    • Dubai stormwater tunnel

      Dubai advances 10.3km deep-tunnel drainage project

    • Mumbai sewer tunnel TBM

      TERRATEC TBM Completes Mumbai Sewer Tunnel in India

    • Panama Canal tunnel drive completed

      Panama Canal Tunnel Drive Completed by Herrenknecht TBM for Panama Metro’s Line 3

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • 2026 ITA Tunnelling Awards

      2026 ITA Tunnelling Awards recognise global industry achievements

    • HSR Asia 2027

      HSR Asia 2027 to focus on delivering Asia-Pacific’s next generation of high-speed rail

    • Ohio River Tunnel project

      Ohio River Tunnel Project Breaks Ground in Pittsburgh

    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

  • PROJECTS
    • Second Avenue Subway TBM

      First Second Avenue Subway TBM passes Factory Acceptance Test

    • Fehmarnbelt Tunnel German portal

      Structural works completed at German portal of Fehmarnbelt Tunnel

    • Ballard Link tunnel project

      Ballard Link tunnel scheme advances towards environmental review

    • Borumba exploratory tunnelling

      Borumba Exploratory Tunnelling Procurement Suspended in Queensland

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

First Second Avenue Subway TBM passes Factory Acceptance Test

RMTC appointed to manage Riyadh Metro Red Line extension

Third TBM breakthrough achieved on Toulouse Metro Line C

2026 ITA Tunnelling Awards recognise global industry achievements

Structural works completed at German portal of Fehmarnbelt Tunnel