logo
mobileLogo
  • HOME
  • NEWS
    • Breakthrough for new Cornberg rail tunnel

      6 hours ago
    • Hinkley Point C fish return tunnel

      Hinkley Point C completes tunnelling fish return system

    • Lower Thames Crossing zero-emission construction

      Lower Thames Crossing deploys zero-emission construction fleet

    • Bucharest Metro Line 6 TBM

      TERRATEC TBM reaches halfway point on Bucharest Line 6

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • ISTSS 2027 poster submissions

      ISTSS calls for poster submissions

    • Copenhagen M5 metro civil works

      Costain appoints new managing director for SCS JV

    • Hudson Tunnel Project TBM

      Boring Begins for Hudson Tunnel Project

    • Bern station caverns

      Marti completes Bern station cavern shells

  • PROJECTS
    • Bucharest Metro Line 6 tunnelling

      Tunnelling nears halfway point on Bucharest Metro Line 6 section

    • Kaiserstuhl Tunnel excavation

      Kaiserstuhl Tunnel excavation completed

    • Dubai Loop TBM assembly

      Dubai Loop advances to TBM assembly

    • Copenhagen M5 metro civil works

      Copenhagen retenders €800M M5 civil works package

  • CONTACT US

Tag: Tunneling

Contract/projects

Naples-Bari Rail Tunnel – TBM breaks through

By rosebell
September 10, 2024
News

Dubai Sewerage Project – Extending prequalification period

By rosebell
September 10, 2024
Contract/projects

Austria, Upper Austria-Styria – at/79

By rosebell
September 9, 2024
News

Farrans’ 2025 graduate program – Applications are open

By rosebell
September 9, 2024
News

Bjønnåsen Tunnel Project – Eiffage completes first tube

By rosebell
September 8, 2024
Contract/projects

Colas Rail to upgrade Cairo Metro line

By rosebell
September 8, 2024
Events

Focus of BTS September Evening Lecture is Los Angeles Metro Tunneling

By rosebell
September 8, 2024
Contract/projects

Completion of China’s first variable diameter shaft reaming machine

By rosebell
September 7, 2024
Contract/projects

Inauguration of Stad ship tunnel tender in October

By rosebell
September 7, 2024
News

HS2 Northolt Tunnel Project – Completion of segment production

By rosebell
September 7, 2024

Posts navigation

1...656667...242

Posts List

  1. Hefei 16.68m TBM

    China’s largest domestic TBM ready for Hefei reservoir drive

  2. Valfabbrica tunnel project

    Valfabbrica project moves into final phase

  3. Santa Cruz Robbins TBM access tunnel

    Santa Cruz PFS confirms 4km Robbins TBM access tunnel

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • Breakthrough for new Cornberg rail tunnel

      6 hours ago
    • Hinkley Point C fish return tunnel

      Hinkley Point C completes tunnelling fish return system

    • Lower Thames Crossing zero-emission construction

      Lower Thames Crossing deploys zero-emission construction fleet

    • Bucharest Metro Line 6 TBM

      TERRATEC TBM reaches halfway point on Bucharest Line 6

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • ISTSS 2027 poster submissions

      ISTSS calls for poster submissions

    • Copenhagen M5 metro civil works

      Costain appoints new managing director for SCS JV

    • Hudson Tunnel Project TBM

      Boring Begins for Hudson Tunnel Project

    • Bern station caverns

      Marti completes Bern station cavern shells

  • PROJECTS
    • Bucharest Metro Line 6 tunnelling

      Tunnelling nears halfway point on Bucharest Metro Line 6 section

    • Kaiserstuhl Tunnel excavation

      Kaiserstuhl Tunnel excavation completed

    • Dubai Loop TBM assembly

      Dubai Loop advances to TBM assembly

    • Copenhagen M5 metro civil works

      Copenhagen retenders €800M M5 civil works package

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

Breakthrough for new Cornberg rail tunnel

ISTSS calls for poster submissions

Granite wins Big Creek Tunnel contract

Hinkley Point C completes tunnelling fish return system

Tunnelling nears halfway point on Bucharest Metro Line 6 section