An open tender for manufacture, delivery and installation of a 380 kV HVAC cable system with a current carrying capacity of 2,500 amperes in a tunnel from the Mitte substation to the Charlottenburg substation and in a tunnel from the Charlottenburg substation to the Rudolf-Wissell-Brücke primary shaft at Berlin. The agreement consists of 2 lots. The determined time period for this project is 48 months.
Closing Date: 22.03.2021
Further information can be reached in below addresses:
50Hertz Transmission GmbH, Berlin
Fax: +49 3051502616
Email: christian.junghans@50hertz.com