NewsProject Show Case

HS2 revealed shortlist for Washwood Heath project

HS2 Washwood Heath Project Site

The final list of proposers to construct the high speed rail project’s network control center and rolling stock maintenance depot, was confirmed by HS2 Ltd. The intended contract, which’s value is around EUR320.84 million (GBP275 million), includes transforming the 30-hectare brown field site into the nerve center of the HS2 network and the selected bidder is going to work with HS2 Ltd.

    The invited bidders to this tender are:

  • GULERMAK AGIR SAN. İNSAAT VE TAAH. A.S & Gulermak Sp z o.o.
  • VINCI Construction UK Limited (t/a Taylor Woodrow) & Keltbray Limited
  • VolkerFitzpatrick Ltd & VolkerRail Ltd

A Rolling Stock Maintenance Building, Carriage Wash, Automatic Vehicle Inspection Building and 14 sidings where trains can be stored overnight, are the subsets of this depot.

The cleaners and drivers also will be able to access to the Network Integrated Control Centre, the center of the network’s state-of-the-art signaling and control systems as well as office buildings on the same site.

For further information on this project please click here for tunnelingworld archive. Also more details are accessible in this website.

What is your reaction?

Excited
0
Happy
0
In Love
0
Not Sure
0
Silly
0

You may also like

Leave a reply

Your email address will not be published. Required fields are marked *

More in:News