Calling enthusiasts to participate in a tender that has been announced for the construction work on the state road from the Vuvevica junction on the A1 to the junction on the D8, section km 0 + 613 – km 7 + 480, including the Kozjak tunnel. The 2530 m single-tube tunnel will be for two-way traffic with a safety parallel tunnel. The tunnel – designed for 80 km/h – will be built by NATM.
The determined time period for this project is 36 months and the awarded contract budget is EUR 83.13 million (HRK625 million), excluding VAT.
The related tender documents are attached here and here.