
highway tunnel entrance at night nobody
Calling enthusiasts to participate in a tender that has been announced for geotechnical monitoring during the refurbishment works of the Landecker tunnel on the A12 in Innsbruck, including the construction of the emergency tunnel (6.7 km), the 23 bypasses and 3 ventilation niches in the main tunnel in Innsbruck.
The determined time duration for this contract is from 01/09/2025 to 31/12/2030.
The related tender documents are attached here and here.
For further information, please contact:
ASFINAG, attn Ulrich Engbert, Vienna
Tel: +43 5010814485
Email: ulrich.engbert@asfinag.at
Deadline: 13/06/2025
What is your reaction?
Excited
0
Happy
0
In Love
0
Not Sure
0
Silly
0