logo
mobileLogo
  • HOME
  • NEWS
    • Second 16.68m TBM completes assembly for Hefei reservoir crossing

      1 hour ago
    • Dubai stormwater tunnel

      Dubai advances 10.3km deep-tunnel drainage project

    • Mumbai sewer tunnel TBM

      TERRATEC TBM Completes Mumbai Sewer Tunnel in India

    • Panama Canal tunnel drive completed

      Panama Canal Tunnel Drive Completed by Herrenknecht TBM for Panama Metro’s Line 3

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • Ohio River Tunnel project

      Ohio River Tunnel Project Breaks Ground in Pittsburgh

    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

    • Eyre Peninsula desalination plant tunnel

      Tunnelling Completed for South Australia Desalination Plant

    • Hong Kong East Drainage Tunnel

      Bouygues and CRBC Appointed to Build Hong Kong East Drainage Tunnel

  • PROJECTS
    • Ballard Link tunnel project

      Ballard Link tunnel scheme advances towards environmental review

    • Borumba exploratory tunnelling

      Borumba Exploratory Tunnelling Procurement Suspended in Queensland

    • Copenhagen Metro M5 construction contract

      Copenhagen Metro M5 Two Consortia Shortlisted for Civil Works Contract

    • Suburban Rail Loop East TBMs

      Three TBMs Now Tunnelling on Melbourne’s Suburban Rail Loop East

  • CONTACT US

Tag: Xenia Consortium

News

Naming Italian high-speed rail TBMs

By rosebell
November 18, 2025
News

Starting up TBM-naming contest by Xenia Consortium

By rosebell
November 5, 2025

Posts List

  1. Snowy 2.0 cost and completion date

    Snowy 2.0 Cost Could Reach A$25bn as Completion Target Moves to Late 2029

  2. underground hydrogen storage

    Abergeldie Secures US Patent for Underground Hydrogen Storage Technology

  3. CRCHI gripper TBM South Korea

    CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • Second 16.68m TBM completes assembly for Hefei reservoir crossing

      1 hour ago
    • Dubai stormwater tunnel

      Dubai advances 10.3km deep-tunnel drainage project

    • Mumbai sewer tunnel TBM

      TERRATEC TBM Completes Mumbai Sewer Tunnel in India

    • Panama Canal tunnel drive completed

      Panama Canal Tunnel Drive Completed by Herrenknecht TBM for Panama Metro’s Line 3

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • Ohio River Tunnel project

      Ohio River Tunnel Project Breaks Ground in Pittsburgh

    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

    • Eyre Peninsula desalination plant tunnel

      Tunnelling Completed for South Australia Desalination Plant

    • Hong Kong East Drainage Tunnel

      Bouygues and CRBC Appointed to Build Hong Kong East Drainage Tunnel

  • PROJECTS
    • Ballard Link tunnel project

      Ballard Link tunnel scheme advances towards environmental review

    • Borumba exploratory tunnelling

      Borumba Exploratory Tunnelling Procurement Suspended in Queensland

    • Copenhagen Metro M5 construction contract

      Copenhagen Metro M5 Two Consortia Shortlisted for Civil Works Contract

    • Suburban Rail Loop East TBMs

      Three TBMs Now Tunnelling on Melbourne’s Suburban Rail Loop East

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

Ballard Link tunnel scheme advances towards environmental review

Second 16.68m TBM completes assembly for Hefei reservoir crossing

Dubai advances 10.3km deep-tunnel drainage project

MWAA seeks industry interest for US$3.75bn Dulles Airport tunnel expansion

Borumba Exploratory Tunnelling Procurement Suspended in Queensland