logo
mobileLogo
  • HOME
  • NEWS
    • Second 16.68m TBM completes assembly for Hefei reservoir crossing

      23 hours ago
    • Dubai stormwater tunnel

      Dubai advances 10.3km deep-tunnel drainage project

    • Mumbai sewer tunnel TBM

      TERRATEC TBM Completes Mumbai Sewer Tunnel in India

    • Panama Canal tunnel drive completed

      Panama Canal Tunnel Drive Completed by Herrenknecht TBM for Panama Metro’s Line 3

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • HSR Asia 2027

      HSR Asia 2027 to focus on delivering Asia-Pacific’s next generation of high-speed rail

    • Ohio River Tunnel project

      Ohio River Tunnel Project Breaks Ground in Pittsburgh

    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

    • Eyre Peninsula desalination plant tunnel

      Tunnelling Completed for South Australia Desalination Plant

  • PROJECTS
    • Fehmarnbelt Tunnel German portal

      Structural works completed at German portal of Fehmarnbelt Tunnel

    • Ballard Link tunnel project

      Ballard Link tunnel scheme advances towards environmental review

    • Borumba exploratory tunnelling

      Borumba Exploratory Tunnelling Procurement Suspended in Queensland

    • Copenhagen Metro M5 construction contract

      Copenhagen Metro M5 Two Consortia Shortlisted for Civil Works Contract

  • CONTACT US

Tag: Stalac-Junis line

Rasina Municipality Tunnel in Sebria
News

Rasina Municipality Tunnel, Sebria

By ashleykaren
August 8, 2021

Posts List

  1. Fudong Road River Crossing TBM

    CREG Completes 15.01m Slurry TBM for Wenzhou River Crossing

  2. Ryde to Pymble Pipeline Upgrade

    Sydney Water Prepares to Launch mTBM for Ryde–Pymble Pipeline Upgrade

  3. Snowy 2.0 cost and completion date

    Snowy 2.0 Cost Could Reach A$25bn as Completion Target Moves to Late 2029

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • Second 16.68m TBM completes assembly for Hefei reservoir crossing

      23 hours ago
    • Dubai stormwater tunnel

      Dubai advances 10.3km deep-tunnel drainage project

    • Mumbai sewer tunnel TBM

      TERRATEC TBM Completes Mumbai Sewer Tunnel in India

    • Panama Canal tunnel drive completed

      Panama Canal Tunnel Drive Completed by Herrenknecht TBM for Panama Metro’s Line 3

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • HSR Asia 2027

      HSR Asia 2027 to focus on delivering Asia-Pacific’s next generation of high-speed rail

    • Ohio River Tunnel project

      Ohio River Tunnel Project Breaks Ground in Pittsburgh

    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

    • Eyre Peninsula desalination plant tunnel

      Tunnelling Completed for South Australia Desalination Plant

  • PROJECTS
    • Fehmarnbelt Tunnel German portal

      Structural works completed at German portal of Fehmarnbelt Tunnel

    • Ballard Link tunnel project

      Ballard Link tunnel scheme advances towards environmental review

    • Borumba exploratory tunnelling

      Borumba Exploratory Tunnelling Procurement Suspended in Queensland

    • Copenhagen Metro M5 construction contract

      Copenhagen Metro M5 Two Consortia Shortlisted for Civil Works Contract

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

Structural works completed at German portal of Fehmarnbelt Tunnel

HSR Asia 2027 to focus on delivering Asia-Pacific’s next generation of high-speed rail

Ballard Link tunnel scheme advances towards environmental review

Second 16.68m TBM completes assembly for Hefei reservoir crossing

Dubai advances 10.3km deep-tunnel drainage project