The Tideway Program Director, Andy Alder, presented an update about the current advance of Tideway Projects and the approaches being used during the London December`s BTS (British Tunneling Society) evening. Also, following this issue, the BMB JV (the joint venture between BAM Nuttall Ltd, Morgan Sindall Plc and Balfour Beatty Group Ltd), FLO JV (which is the joint venture between Ferrovial Agroman UK Ltd, Laing O’Rourke Construction) and the CVB JV (a joint venture between Costain Vinci Construction Grands Projects Bachy Soletanche) have presented some reports. Some of the responsibilities of these companies is to involve in all the West, Central and East Contracts and work at the multiple Tideway worksites.
They have explained some of the technical challenges that have been faced and overcome. For further information, you can check the below links: