
As The Boring Company (TBC) states, it has constructed a tunnel using a fully-automated TBM.
In a post with a video on X, TBC says its Zero-People-in-Tunnel (ZPIT) configuration means nobody but the videographer was on the machine.
The machine advanced and erected a ring weighing around 10.8 tonnes.
According to the company: “In the same way that full and rapid reusability is the holy grail for rockets, ZPIT continuous mining is the holy grail for boring machines. This is the safest, fastest, and least expensive architecture to build tunnels.”
What is your reaction?
Excited
0
Happy
0
In Love
0
Not Sure
0
Silly
0