logo
mobileLogo
  • HOME
  • NEWS
    • NZ prime minister previews City Rail Link

      2 days ago
    • Completing cavern excavation for Japan’s neutrino detector

    • Constructing stormwater tunnel in Lancashire by United Utilities

    • Winner of Yonge North Subway tunneling contract is North End Connectors

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • BTS September lecture is the ambitious Coire Glas exploratory works

    • BTS June lecture focuses on Prague Metro Line D

    •  WTC2026 – Abstract submissions deadline approaches

    • BTS lecture gives early insights into HARP

  • PROJECTS
    • Lower Olentangy Tunnel Project – Final breakthrough of TBM

    • BART Silicon Valley Phase II Project – VTA report affirms single bore approach

    • Preparing Canada’s first small modular reactor project for boring

    • Austria, Tyrol – at/102

  • CONTACT US

Project Show Case

Work begins on the German side of the Fehmarnbelt Tunnel Project
Project Show Case

Commencing Work Process on the German Side of the Fehmarnbelt Tunnel Project

By lyndamyer
December 3, 2021
HS2 Tunnels 3D Models
Project Show Case

Appointing French Specialist Matière to Install HS2 Cut and Cover Tunnels

By lyndamyer
December 2, 2021
Irish Sea Tunnel 3D Model Illustrated
Project Show Case

Exorbitant Costs for Irish Sea Tunnel Construction

By lyndamyer
December 1, 2021
TERRATEC EPB TBM for Kanpur MRTS Project
Project Show Case

Kanpur Metro’s 1st Underground Section’s Two TBMs is Delivered by TERRATEC

By lyndamyer
November 30, 2021
Novomoskovskaya Station of the Sokolnicheskaya Metro Line
Project Show Case

Preparation 30% of the Novomoskovskaya Station of the Sokolnicheskaya Metro Line

By lyndamyer
November 30, 2021
urban tunnel at Malaga-Costa del Sol Airport - maintenance contract awarded to SICE
Project Show Case

SICE SA from Madrid has Secured the EUR 282,560 Contract

By ashleykaren
November 30, 2021
the main tunnel at carnwath road fulham Tideway Project
Project Show Case

Interim Report Confirms Tideway Project on Track for 2025 Completion

By ashleykaren
November 30, 2021
Troitskaya metro line
Project Show Case

The Five Stations’ Key Structures of the Future Troitskaya Metro Line are more than Half Completed

By ashleykaren
November 30, 2021
tfn and network rail reconsider delivery of infrastructure and services
Project Show Case

Revision in TfN and Network Rail’s Infrastructure and Services

By lyndamyer
November 30, 2021
Mont Blanc Tunnel, France, Rhone-Alps (fr107)
Project Show Case

Mont Blanc Tunnel, France, Rhone-Alps (fr/107)

By lyndamyer
November 30, 2021

Posts navigation

1...158159160...218

Posts List

  1. Completing Fangxi Water Diversion Tunnel

  2. Robbins’ tunneling scope completed for Golden Line package

  3. Completing segment production for BBT lot H41

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • NZ prime minister previews City Rail Link

      2 days ago
    • Completing cavern excavation for Japan’s neutrino detector

    • Constructing stormwater tunnel in Lancashire by United Utilities

    • Winner of Yonge North Subway tunneling contract is North End Connectors

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • BTS September lecture is the ambitious Coire Glas exploratory works

    • BTS June lecture focuses on Prague Metro Line D

    •  WTC2026 – Abstract submissions deadline approaches

    • BTS lecture gives early insights into HARP

  • PROJECTS
    • Lower Olentangy Tunnel Project – Final breakthrough of TBM

    • BART Silicon Valley Phase II Project – VTA report affirms single bore approach

    • Preparing Canada’s first small modular reactor project for boring

    • Austria, Tyrol – at/102

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

Lower Olentangy Tunnel Project – Final breakthrough of TBM

BART Silicon Valley Phase II Project – VTA report affirms single bore approach

NZ prime minister previews City Rail Link

Preparing Canada’s first small modular reactor project for boring

Completing cavern excavation for Japan’s neutrino detector