The contract with the value of EUR 607,550, excluding VAT, for assistance with acoustic and vibration issues for the metro line 3 extension towards Schaerbeek and Evere in Brussels, has been awarded by Tractebel Engineering SA from Brussels. The contract includes construction of almost 5km of tunnels with 7 stations: 4 at Schaerbeek (Liedts, Colignon, Verboekhoven, Riga) and 3 at Evere (Tilleul, Paix, Bordet).
The related tender documents are attached here.
For further information about this project please contact:
Direction infrastructure de transport, Brussels
– Tel: +32 22774688
– Email: adjudications.beliris@mobilit.fgov.be
What is your reaction?
Excited
0
Happy
0
In Love
0
Not Sure
0
Silly
0