logo
mobileLogo
  • HOME
  • NEWS
    • India Advances Domestic TBM Manufacturing as Rishikesh–Karnaprayag Rail Project Progresses

      2 minutes ago
    • Snowy 2.0 cost and completion date

      Snowy 2.0 Cost Could Reach A$25bn as Completion Target Moves to Late 2029

    • underground hydrogen storage

      Abergeldie Secures US Patent for Underground Hydrogen Storage Technology

    • China TBM export controls

      China Introduces Export Controls on Tunnel Boring Machines

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

    • Eyre Peninsula desalination plant tunnel

      Tunnelling Completed for South Australia Desalination Plant

    • Hong Kong East Drainage Tunnel

      Bouygues and CRBC Appointed to Build Hong Kong East Drainage Tunnel

    • WTC2027

      WTC2027 Registration Opens Ahead of Antwerp Congress

  • PROJECTS
    • Fudong Road River Crossing TBM

      CREG Completes 15.01m Slurry TBM for Wenzhou River Crossing

    • Ryde to Pymble Pipeline Upgrade

      Sydney Water Prepares to Launch mTBM for Ryde–Pymble Pipeline Upgrade

    • Cross Island Line tunnelling

      Ground Anchors Halt Cross Island Line Tunnelling at Ang Mo Kio

    • Suburban Rail Loop East TBM

      Second TBM Begins Arrival for Melbourne’s Suburban Rail Loop East

  • CONTACT US

News

News

China’s Linghang shield machine passes 10km mark under Yangtze

By rosebell
December 21, 2025
News

Launching first TBM for DB InfraGO’s second main line in Munich

By rosebell
December 21, 2025
News

Chennai Metro advances Phase 2 tunnelling with new TBM drive on Corridor 4

By rosebell
December 20, 2025
News

Tunnel strengthening is up to LTA

By rosebell
December 14, 2025
News

VTA hosts West Portal construction site tour

By rosebell
December 14, 2025
News

Arrival of T2D TBM components in Adelaide

By rosebell
December 14, 2025
News

Lötschberg Base Tunnel Project – AFRY appointed owner’s engineer for expansion

By rosebell
December 14, 2025
News

Scottish Water tunnel negotiates motorway and rail line

By rosebell
December 14, 2025
News

Chennai Metro Rail Ltd (CMRL) – Celebrating TBM breakthrough and launch

By rosebell
December 10, 2025
News

Breakthrough in Mumbai water project

By rosebell
December 2, 2025

Posts navigation

1...8910...280

Posts List

  1. Genoa undersea road tunnel

    Webuild Signs €803m Contract for Genoa Undersea Road Tunnel

  2. Sizewell C marine tunnelling design

    Amentum Wins £22.3m Sizewell C Marine Tunnelling Design Contract

  3. Seattle Ship Canal storage tunnel

    Lane Completes Seattle Ship Canal Wastewater Storage Tunnel

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • India Advances Domestic TBM Manufacturing as Rishikesh–Karnaprayag Rail Project Progresses

      2 minutes ago
    • Snowy 2.0 cost and completion date

      Snowy 2.0 Cost Could Reach A$25bn as Completion Target Moves to Late 2029

    • underground hydrogen storage

      Abergeldie Secures US Patent for Underground Hydrogen Storage Technology

    • China TBM export controls

      China Introduces Export Controls on Tunnel Boring Machines

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • CRCHI gripper TBM South Korea

      CRCHI Completes Gripper TBM Drive on South Korean High-Speed Rail Project

    • Eyre Peninsula desalination plant tunnel

      Tunnelling Completed for South Australia Desalination Plant

    • Hong Kong East Drainage Tunnel

      Bouygues and CRBC Appointed to Build Hong Kong East Drainage Tunnel

    • WTC2027

      WTC2027 Registration Opens Ahead of Antwerp Congress

  • PROJECTS
    • Fudong Road River Crossing TBM

      CREG Completes 15.01m Slurry TBM for Wenzhou River Crossing

    • Ryde to Pymble Pipeline Upgrade

      Sydney Water Prepares to Launch mTBM for Ryde–Pymble Pipeline Upgrade

    • Cross Island Line tunnelling

      Ground Anchors Halt Cross Island Line Tunnelling at Ang Mo Kio

    • Suburban Rail Loop East TBM

      Second TBM Begins Arrival for Melbourne’s Suburban Rail Loop East

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

India Advances Domestic TBM Manufacturing as Rishikesh–Karnaprayag Rail Project Progresses

TBM Kinga Starts Poland’s Longest Railway Evacuation Tunnel

CREG Completes 15.01m Slurry TBM for Wenzhou River Crossing

Sydney Water Prepares to Launch mTBM for Ryde–Pymble Pipeline Upgrade

Snowy 2.0 Cost Could Reach A$25bn as Completion Target Moves to Late 2029