logo
mobileLogo
  • HOME
  • NEWS
    • East River Tunnel Project – Demolishing bench walls

      13 hours ago
    • The Polish rail tunnel contract was concluded by Porr

    • Michigan RFI for drainage tunnel power needs

    • NZ prime minister previews City Rail Link

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • BTS September lecture is the ambitious Coire Glas exploratory works

    • BTS June lecture focuses on Prague Metro Line D

    •  WTC2026 – Abstract submissions deadline approaches

    • BTS lecture gives early insights into HARP

  • PROJECTS
    • Completing the tunneling process on Coffs Harbour Bypass

    • West Link subproject – Veidekke concluded the contract

    • Lower Olentangy Tunnel Project – Final breakthrough of TBM

    • BART Silicon Valley Phase II Project – VTA report affirms single bore approach

  • CONTACT US

Tag: HS2

HS2 Early works at Old Oak Common
News

High Speed 2 Construction Commissioner Warns of Mounting Problems at Old Oak Common and Euston

By ashleykaren
September 11, 2021
Earth movement detection system trialled on HS2
News

The Ground Movement Detection System Tested on High Speed 2 Construction Project

By ashleykaren
September 9, 2021
HS2 Final Chiltern tunnel headhouse location
News

HS2: Final Chiltern Tunnel Headhouse Design Revealed

By lyndamyer
September 4, 2021
hs2 trio birmingham interchange station
News

HS2 Trio was Selected for Birmingham Interchange Station

By lyndamyer
September 1, 2021
HS2 Tunnels Map - Pacadar UK is going to manufacture the concrete precast tunnel segments of the project
News

HS2 Concrete Precast Tunnel Segments, United Kingdom, National

By ashleykaren
August 11, 2021
Old Oak Common Retaining Wall Construction Site
Features

Sheet Piling UK has Installed a Temporary Retaining Wall at the High Speed 2 (HS2) Old Oak Common

By ashleykaren
July 27, 2021
The winner of second stage of HS2's contract is Kier
Project Show Case

The winner of second stage of HS2’s contract is Kier

By lyndamyer
July 15, 2021
HS2 's oblige for revision the northern leg due to materials crisis
Features

HS2 ‘s oblige for revision the northern leg due to materials crisis

By lyndamyer
July 14, 2021
News

Lower Thames Crossing team’s inspection from HS2’s Chilterns tunnels site

By lyndamyer
July 4, 2021
Features

Chiltern tunnel green scheme commences by HS2

By lyndamyer
June 24, 2021

Posts navigation

12345

Posts List

  1. Hanoi Metro Project – TBM Flash breaks through

  2. Heathrow Airport – Proposing motorway tunnel under new runway

  3. Taskforce to track Lower Thames Crossing skills and green targets

Categories

  • bg-0
    News
  • bg-0
    Features
  • bg-0
    Contract/projects
  • bg-0
    Events
logo
All Rights Reserved by www.tunnelingworld.com
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US
logo logo
  • HOME
  • NEWS
    • East River Tunnel Project – Demolishing bench walls

      13 hours ago
    • The Polish rail tunnel contract was concluded by Porr

    • Michigan RFI for drainage tunnel power needs

    • NZ prime minister previews City Rail Link

  • FEATURES
    • Completion of GHH Group’s acquisition by Komatsu

    • Analia Franco station of the São Paulo Line 2 – Breakthrough at the extension

    • Coire Glas Exploratory Tunnel – Achieving to the record of 1000m

    • Unveiling Earthgrid Tunnel Boring Robot

  • EVENTS
    • BTS September lecture is the ambitious Coire Glas exploratory works

    • BTS June lecture focuses on Prague Metro Line D

    •  WTC2026 – Abstract submissions deadline approaches

    • BTS lecture gives early insights into HARP

  • PROJECTS
    • Completing the tunneling process on Coffs Harbour Bypass

    • West Link subproject – Veidekke concluded the contract

    • Lower Olentangy Tunnel Project – Final breakthrough of TBM

    • BART Silicon Valley Phase II Project – VTA report affirms single bore approach

  • CONTACT US
0 %
  • Log in

Lost your password?

logo

✕ Close
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

logo

✕
  • HOME
  • NEWS
  • FEATURES
  • EVENTS
  • PROJECTS
  • CONTACT US

Latest Posts

East River Tunnel Project – Demolishing bench walls

The Polish rail tunnel contract was concluded by Porr

Completing the tunneling process on Coffs Harbour Bypass

West Link subproject – Veidekke concluded the contract

Michigan RFI for drainage tunnel power needs