{"id":9711,"date":"2023-01-07T06:56:38","date_gmt":"2023-01-07T06:56:38","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=9711"},"modified":"2023-01-07T06:56:38","modified_gmt":"2023-01-07T06:56:38","slug":"northern-italys-road-tunnels-tenders-it-222","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=9711","title":{"rendered":"Northern Italy\u2019s Road Tunnels Tenders (it\/222)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the structural equipment restoration works on Northern Italy\u2019s road tunnels. The contract is composed of 2 lots: Lot 1 &#8211; Lombardia, Piedmont, Valle d\u2019Aosta and Liguria; Lot 2 &#8211; Veneto, Friuli Venezia Giulia and Emilia-Romagna.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is 1095 days and the awarded contract budget is EUR130 million, excluding VAT.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/acquisti.stradeanas.it\/\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=001586-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span display: inline-block; margin-top: 0.75rem; margin-left: 1.5rem;\">ANAS Spa, attn Eng.Enrico Mittiga, Rome<br \/>\n&#8211; Email: <a href=\"mailto:appalti.lavori@postacert.stradeanas.it\">appalti.lavori@postacert.stradeanas.it<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for the structural equipment restoration works on Northern Italy\u2019s road tunnels. The contract is composed of 2 lots: Lot 1 &#8211; Lombardia, Piedmont, Valle d\u2019Aosta and Liguria; Lot 2 &#8211; Veneto, Friuli Venezia Giulia and Emilia-Romagna. The determined time duration for this project is 1095 days and the awarded contract budget is EUR130 million, excluding VAT. The related tender documents are attached here and here. For further information, please contact:<\/p>\n","protected":false},"author":2,"featured_media":9713,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[223,2875,101,2876,204,47],"class_list":["post-9711","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-italy","tag-northern-italys-road-tunnels","tag-road","tag-structural-equipment-restoration-works","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/9711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9711"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/9711\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/9713"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}