{"id":9331,"date":"2022-12-04T05:58:22","date_gmt":"2022-12-04T05:58:22","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=9331"},"modified":"2022-12-04T05:58:22","modified_gmt":"2022-12-04T05:58:22","slug":"thames-tideway-tunnel-2022-update","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=9331","title":{"rendered":"Thames Tideway Tunnel &#8211; 2022 Update"},"content":{"rendered":"<p style=\"text-align: justify;\">In order to providing an overview of specific challenges across project areas (West, Central and East), and the solutions implemented for their resolution, this 2022 update has been presented by Thames Tideway Tunnel\u2019s Client, Project Manager and Main Works Contractor teams.<\/p>\n<p style=\"text-align: justify;\">The follows are topics that are due to be covered, along with associated speakers:<\/p>\n<ul>\n<li>Introduction and Tideway progress during 2022<br \/>\nJim Avant (Delivery Director, Tideway)<\/li>\n<li>West Area Secondary Lining<br \/>\nAlexei Bond (BMB) and Ryan Moor (Tideway \/ Jacobs)<\/li>\n<li>King Edward Memorial Park, challenges and solutions<br \/>\nAnia Gonzalez (Tideway \/ Jacobs) and Jo Kujovic (CVB)<\/li>\n<li>Planning for Systems Commissioning<br \/>\nPhil Robinson (Systems Commissioning Manager, Tideway)<\/li>\n<li>Plan for 2023<br \/>\nJames Smith (Deputy Programme Director, Tideway)<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">With a live stream this will be an in-person lecture at <a href=\"https:\/\/www.youtube.com\/embed\/ncm747a2RBI\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">Also Tea &#038; coffee will be served from 17:30 hrs onwards, while Post-lecture drinks will be held at Westminster Arms<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to providing an overview of specific challenges across project areas (West, Central and East), and the solutions implemented for their resolution, this 2022 update has been presented by Thames Tideway Tunnel\u2019s Client, Project Manager and Main Works Contractor teams. The follows are topics that are due to be covered, along with associated speakers: Introduction and Tideway progress during 2022 Jim Avant (Delivery Director, Tideway) West Area Secondary Lining Alexei Bond (BMB) and Ryan Moor (Tideway \/ Jacobs) King Edward Memorial Park, challenges and solutions Ania Gonzalez (Tideway \/ Jacobs) and Jo Kujovic (CVB) Planning for Systems Commissioning Phil [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":9333,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[2770,2771,2772,47,48],"class_list":["post-9331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-2022-update","tag-in-person-lecture","tag-thames-tideway-tunnel-project","tag-tunneling","tag-uk","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/9331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9331"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/9331\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/9333"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}