{"id":8580,"date":"2022-10-13T07:24:34","date_gmt":"2022-10-13T07:24:34","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=8580"},"modified":"2022-10-13T07:24:34","modified_gmt":"2022-10-13T07:24:34","slug":"ahmedabads-second-metro-line-and-line-1-extension-is-now-operational","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=8580","title":{"rendered":"Ahmedabad\u2019s Second Metro Line and Line 1 Extension is Now Operational"},"content":{"rendered":"<p style=\"text-align: justify;\">Ahmedabad metro Line 2 and an extension of Line 1 is now operational for passengers after being opened by Narendra Modi, Indian Prime Minister.<\/p>\n<p style=\"text-align: justify;\">Line 2, which is 18\u00b79 km long and have 15 stations, connects Motera Stadium in the north with APMC in the south.<\/p>\n<p style=\"text-align: justify;\">Construction works began in January 2016, and following an opening ceremony with the presence of Modi on September 30, inaugurated for traffic on October 6. It is said that the trains initially run every 30 min.<\/p>\n<p style=\"text-align: justify;\">The western extension of the east-west Line 1 which started for traffic on October 2, runs 12 km from Apparel Park to Thaltej, with 6\u00b76 km underground, and takes the line to 19 km in total. 10 stations are there on the extension comprising an interchange with Line 2 at Old High Court. In this line, trains run every 20 min.<\/p>\n<p style=\"text-align: justify;\">Also, an intermediate station at Kankaria East is said to be open later, and a further 1\u00b74 km extension west from Thaltej to Thaltej Gam is anticipated to open in March 2023.<\/p>\n<p style=\"text-align: justify;\">The Ahmedabad metro line 1 and 2 are working using 32 three-car Hyundai Rotem driverless trainsets provided under a 177\u00b71bn contract awarded in November 2017. They are 2 900 mm wide with a capacity of 782 passengers and have a max speed of 80 km\/h.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ahmedabad metro Line 2 and an extension of Line 1 is now operational for passengers after being opened by Narendra Modi, Indian Prime Minister. Line 2, which is 18\u00b79 km long and have 15 stations, connects Motera Stadium in the north with APMC in the south. Construction works began in January 2016, and following an opening ceremony with the presence of Modi on September 30, inaugurated for traffic on October 6. It is said that the trains initially run every 30 min. The western extension of the east-west Line 1 which started for traffic on October 2, runs 12 km [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":8583,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[],"class_list":["post-8580","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ahmedabad Metro Line 1 and 2 are Now Operational - Tunnelingworld<\/title>\n<meta name=\"description\" content=\"Ahmedabad metro Line 2 and an extension of Line 1 are now operational for passengers after being opened by Narendra Modi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=8580\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ahmedabad Metro Line 1 and 2 are Now Operational - Tunnelingworld\" \/>\n<meta property=\"og:description\" content=\"Ahmedabad metro Line 2 and an extension of Line 1 are now operational for passengers after being opened by Narendra Modi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=8580\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-13T07:24:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/10\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"795\" \/>\n\t<meta property=\"og:image:height\" content=\"530\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ashleykaren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ashleykaren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580\"},\"author\":{\"name\":\"ashleykaren\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/3a124786bb4f95cd5862041ae17c2b2c\"},\"headline\":\"Ahmedabad\u2019s Second Metro Line and Line 1 Extension is Now Operational\",\"datePublished\":\"2022-10-13T07:24:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580\"},\"wordCount\":205,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg\",\"articleSection\":[\"News\",\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580\",\"name\":\"Ahmedabad Metro Line 1 and 2 are Now Operational - Tunnelingworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg\",\"datePublished\":\"2022-10-13T07:24:34+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/3a124786bb4f95cd5862041ae17c2b2c\"},\"description\":\"Ahmedabad metro Line 2 and an extension of Line 1 are now operational for passengers after being opened by Narendra Modi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg\",\"width\":795,\"height\":530,\"caption\":\"Ahmedabad metro Line 2 Oppening by Prime Minister\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=8580#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ahmedabad\u2019s Second Metro Line and Line 1 Extension is Now Operational\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/3a124786bb4f95cd5862041ae17c2b2c\",\"name\":\"ashleykaren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"ashleykaren\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=3\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ahmedabad Metro Line 1 and 2 are Now Operational - Tunnelingworld","description":"Ahmedabad metro Line 2 and an extension of Line 1 are now operational for passengers after being opened by Narendra Modi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=8580","og_locale":"en_US","og_type":"article","og_title":"Ahmedabad Metro Line 1 and 2 are Now Operational - Tunnelingworld","og_description":"Ahmedabad metro Line 2 and an extension of Line 1 are now operational for passengers after being opened by Narendra Modi.","og_url":"https:\/\/tunnelingworld.com\/?p=8580","og_site_name":"Tunnelingworld","article_published_time":"2022-10-13T07:24:34+00:00","og_image":[{"width":795,"height":530,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/10\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg","type":"image\/jpeg"}],"author":"ashleykaren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ashleykaren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=8580#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=8580"},"author":{"name":"ashleykaren","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/3a124786bb4f95cd5862041ae17c2b2c"},"headline":"Ahmedabad\u2019s Second Metro Line and Line 1 Extension is Now Operational","datePublished":"2022-10-13T07:24:34+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=8580"},"wordCount":205,"commentCount":0,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=8580#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/10\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg","articleSection":["News","Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=8580","url":"https:\/\/tunnelingworld.com\/?p=8580","name":"Ahmedabad Metro Line 1 and 2 are Now Operational - Tunnelingworld","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=8580#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=8580#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/10\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg","datePublished":"2022-10-13T07:24:34+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/3a124786bb4f95cd5862041ae17c2b2c"},"description":"Ahmedabad metro Line 2 and an extension of Line 1 are now operational for passengers after being opened by Narendra Modi.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=8580#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=8580"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=8580#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/10\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/10\/Ahmedabad-metro-Line-2-Oppening-by-Prime-Minister-1.jpg","width":795,"height":530,"caption":"Ahmedabad metro Line 2 Oppening by Prime Minister"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=8580#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Ahmedabad\u2019s Second Metro Line and Line 1 Extension is Now Operational"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/3a124786bb4f95cd5862041ae17c2b2c","name":"ashleykaren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"ashleykaren"},"url":"https:\/\/tunnelingworld.com\/?author=3"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/8580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8580"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/8580\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/8583"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}