{"id":7920,"date":"2022-07-24T11:06:00","date_gmt":"2022-07-24T11:06:00","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=7920"},"modified":"2022-07-24T11:06:00","modified_gmt":"2022-07-24T11:06:00","slug":"sotetsu-tokyu-link-tracklaying-completed","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=7920","title":{"rendered":"Sotetsu Tokyu Link Tracklaying completed"},"content":{"rendered":"<p style=\"text-align: justify;\">On 8 July 2022, with the attendance of representatives from the two railways and the Japan Railway Construction, Transport &#038; Technology Agency, the completion of tracklaying on the link line connecting the Sotetsu and Tokyu railways was done with a ceremony at Shin-Yokohama.<\/p>\n<p style=\"text-align: justify;\">Stretching northeast from the Sotetsu network at Hazawa Yokohama-Kokudai via Shin-Yokohama and Shin-Tsunashima to join the Tokyu Toyoko Line at Hiyoshi, 13\u00b76 km from Tokyo\u2019s Shibuya hub, the 10 km underground line has been constructed by <a href=\"https:\/\/www.jrtt.go.jp\/english\/\" target=\"_blank\" rel=\"noopener\">JRTT<\/a> under an innovative public financing agreement. It will enable the two private railways to operate through services from Kanagawa prefecture and western Yokohama to central Tokyo from March 2023.<\/p>\n<p><img decoding=\"async\" style=\"display: block; margin: auto;\" src=\"\/wp-content\/uploads\/2022\/07\/Sotetsu-and-Tokyu-Railways-Map.jpg\" alt=\"Sotetsu and Tokyu Railways Map\" \/><\/p>\n<p style=\"text-align: justify;\">Shin-Yokohama is due to act as an end-on junction, where crews will change on the through services, while it is located beneath the Tokaido Shinkansen station and will be both railways\u2019 first interchange with the national high-speed network. It will also provide connections to JR East\u2019s Yokohama Line and Yokohama Municipal Subway\u2019s Blue Line.<\/p>\n<p><img decoding=\"async\" style=\"display: block; margin: auto;\" src=\"\/wp-content\/uploads\/2022\/07\/Sotetsu-Tokyu-Link-Tunnels-1.jpg\" alt=\"Sotetsu Tokyu Link Tunnels\" \/><\/p>\n<p style=\"text-align: justify;\">Once a 2\u00b71 km connection between Nishiya on the Sotetsu Main Line and the JR Tokaido Freight Line at Hazawa Yokohama-Kokudai was completed in November 2019, the Sotetsu-Tokyu Link forms the second phase in this complex project. That allowed the start of through running from Ebina and Shonandai to Shinjuku, worked jointly by Sotetsu and JR East. Considering that they operate over 19\u00b78 km of Sotetsu tracks, and 32\u00b77 km on JR East, these trains present an end-to-end journey time of 72 min, with two trains\/h for most of the day and four in the peaks.<\/p>\n<p><img decoding=\"async\" style=\"display: block; margin: auto;\" src=\"\/wp-content\/uploads\/2022\/07\/Sotetsu-Tokyu-Link-Tunnels-2.jpg\" alt=\"Sotetsu Tokyu Link Tunnels\" \/><\/p>\n<p style=\"text-align: justify;\">Due to the inauguration of the Sotetsu-Tokyu Link it is estimated to reduce the Futamatagawa \u2013 Meguro journey time from 54 to 38 min, comparable with today\u2019s best timing of 44 min from Futamatagawa to Shinjuku, whereas Yamato to Shin-Yokohama is going to be cut from 42 min via a change in Yokohama to 23 min by direct train.<\/p>\n<p><img decoding=\"async\" style=\"display: block; margin: auto;\" src=\"\/wp-content\/uploads\/2022\/07\/Sotetsu-Tokyu-Link-Tunnels-3.jpg\" alt=\"Sotetsu Tokyu Link Tunnels\" \/><\/p>\n<p style=\"text-align: justify;\">In order to prevent high property prices and rental costs, the commencement of direct Sotetsu-Tokyu services is expected to make the area northwest of Yokohama more attractive for businesses relocating from central Tokyo. Various urban redevelopment projects are already in progress along the Sotetsu network, in anticipation of residents moving out of inner Tokyo for the same reason.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 8 July 2022, with the attendance of representatives from the two railways and the Japan Railway Construction, Transport &#038; Technology Agency, the completion of tracklaying on the link line connecting the Sotetsu and Tokyu railways was done with a ceremony at Shin-Yokohama. Stretching northeast from the Sotetsu network at Hazawa Yokohama-Kokudai via Shin-Yokohama and Shin-Tsunashima to join the Tokyu Toyoko Line at Hiyoshi, 13\u00b76 km from Tokyo\u2019s Shibuya hub, the 10 km underground line has been constructed by JRTT under an innovative public financing agreement. It will enable the two private railways to operate through services from Kanagawa prefecture [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7926,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[211,2298,2299,2300,47],"class_list":["post-7920","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-japan","tag-sotetsu-tokyu-link-project","tag-tokyu","tag-tracklaying-process","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7920","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7920"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7920\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/7926"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}