{"id":7399,"date":"2022-06-05T05:12:12","date_gmt":"2022-06-05T05:12:12","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=7399"},"modified":"2022-06-05T05:12:12","modified_gmt":"2022-06-05T05:12:12","slug":"arna-stanghelle-project-norway-hordaland-no-252","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=7399","title":{"rendered":"Arna \u2013 Stanghelle Project, Norway, Hordaland (no\/252)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for consultancy services for preparatory work comprising of the formulation of tender documentation, emission applications, preliminary surveys, and environmental plans for the Joint Project Arna \u2013 Stanghelle.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is 18 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/eu.eu-supply.com\/app\/rfq\/rwlentrance_s.asp?PID=332504&#038;B=VEGVESEN\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=240638-2022\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Norwegian Public Roads Administration, attn. Tatiana Maia Pinto Liknes, Moss<br \/>\n&#8211; Email: <a href=\"mailto:tatiana.liknes@vegvesen.no\">tatiana.liknes@vegvesen.no<\/a><br \/>\n<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for consultancy services for preparatory work comprising of the formulation of tender documentation, emission applications, preliminary surveys, and environmental plans for the Joint Project Arna \u2013 Stanghelle. The determined time duration for this project is 18 months. The related tender documents are attached here and here. For further information, please contact: Norwegian Public Roads Administration, attn. Tatiana Maia Pinto Liknes, Moss &#8211; Email: tatiana.liknes@vegvesen.no<\/p>\n","protected":false},"author":2,"featured_media":7401,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[2058,2059,2060,244,204,47],"class_list":["post-7399","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-consultancy-services-for-preparatory-work","tag-highway-and-railway","tag-joint-project-arna-stanghelle","tag-norway","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7399","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7399"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7399\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/7401"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7399"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7399"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7399"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}