{"id":7223,"date":"2022-05-18T11:47:59","date_gmt":"2022-05-18T11:47:59","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=7223"},"modified":"2022-05-18T11:47:59","modified_gmt":"2022-05-18T11:47:59","slug":"north-bothnia-line-sweden-norrbotten-vasterbotten-se-95","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=7223","title":{"rendered":"North Bothnia Line, Sweden, Norrbotten &#038; Vasterbotten (se\/95)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for construction management MAT (Tunnel) for the Norrbotnia\/ North Bothnia Line.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this contract is from 26\/09\/2022 to 26\/05\/2025 and the awarded contract budget is EUR 716,377.95 (SEK7.5million), excluding VAT.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/upphandling.trafikverket.se\/Notice\/NoticeDispatch.aspx?NoticeId=6888\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=243051-2022\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Trafikverket, attn Helena Nygren, Borlange<br \/>\n&#8211; Tel: <a href=\"tel:+46101241674\">+46 101241674<\/a><br \/>\n&#8211; Email:  <a href=\"mailto:helena.nygren@trafikverket.se\">helena.nygren@trafikverket.se<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for construction management MAT (Tunnel) for the Norrbotnia\/ North Bothnia Line. The determined time duration for this contract is from 26\/09\/2022 to 26\/05\/2025 and the awarded contract budget is EUR 716,377.95 (SEK7.5million), excluding VAT. The related tender documents are attached here and here. For further information, please contact: Trafikverket, attn Helena Nygren, Borlange &#8211; Tel: +46 101241674 &#8211; Email: helena.nygren@trafikverket.se<\/p>\n","protected":false},"author":2,"featured_media":7225,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[1328,1974,294,284,204,47],"class_list":["post-7223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-construction-management","tag-mat-tunnel","tag-railway","tag-sweden","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7223"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7223\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/7225"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}