{"id":7185,"date":"2022-05-15T12:29:38","date_gmt":"2022-05-15T12:29:38","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=7185"},"modified":"2022-05-15T12:29:38","modified_gmt":"2022-05-15T12:29:38","slug":"completion-of-sea-outfall-tunnel-for-umm-al-hayman-wastewater-treatment-project-in-kuwait","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=7185","title":{"rendered":"Completion of Sea Outfall Tunnel for Umm Al Hayman Wastewater Treatment Project in Kuwait"},"content":{"rendered":"<p style=\"text-align: justify;\">As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the 1,960 m Sea Outfall tunnel with an internal diameter of 2.2m was completed by the joint venture between Al Hassanain (AHC) and Joseph Gallagher Limited (JGL) on 10 May 2022. The <a href=\"https:\/\/www.herrenknecht.com\/en\/\" target=\"_blank\" rel=\"noopener\">Herrenknecht AG<\/a> AVN 2200mm diameter machine will now rest in its current location whilst the tunnel is stripped, cleaned, connected through in the launch shaft, and then flooded to allow recovery of the 100 t TBM from beneath the sea bed. <\/p>\n<p style=\"text-align: justify;\">In November 2019 the contract was concluded, while the financial closure completed in July 2020 allowing for the project to commence in August 2020. HSBC Middle East was responsible for financing the project.<\/p>\n<p style=\"text-align: justify;\">For further details on this project please click <a href=\"https:\/\/uahpc.com\/aboutus.html\" target=\"_blank\" rel=\"noopener\">here<\/a>, <a href=\"https:\/\/www.josephgallagher.co.uk\/\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/alhassanainco.com\/\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the 1,960 m Sea Outfall tunnel with an internal diameter of 2.2m was completed by the joint venture between Al Hassanain (AHC) and Joseph Gallagher Limited (JGL) on 10 May 2022. The Herrenknecht AG AVN 2200mm diameter machine will now rest in its current location whilst the tunnel is stripped, cleaned, connected through in the launch shaft, and then flooded to allow recovery of the 100 t TBM from beneath the sea bed. In November 2019 the contract was concluded, while the financial closure completed in July [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7187,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[1952,1953,1954,47,1955],"class_list":["post-7185","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-herrenknecht-ag-avn","tag-kuwait","tag-sea-outfall-tunnel","tag-tunneling","tag-umm-al-hayman-wastewater-treatment-project","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Umm Al Hayman Wastewater Treatment Sea Outfall Tunnel Completed<\/title>\n<meta name=\"description\" content=\"As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the Sea Outfall tunnel with an internal diameter of 2.2m was completed\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=7185\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Umm Al Hayman Wastewater Treatment Sea Outfall Tunnel Completed\" \/>\n<meta property=\"og:description\" content=\"As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the Sea Outfall tunnel with an internal diameter of 2.2m was completed\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=7185\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-15T12:29:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/05\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1287\" \/>\n\t<meta property=\"og:image:height\" content=\"672\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"lyndamyer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lyndamyer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185\"},\"author\":{\"name\":\"lyndamyer\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"headline\":\"Completion of Sea Outfall Tunnel for Umm Al Hayman Wastewater Treatment Project in Kuwait\",\"datePublished\":\"2022-05-15T12:29:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185\"},\"wordCount\":138,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg\",\"keywords\":[\"Herrenknecht AG AVN\",\"Kuwait\",\"Sea Outfall Tunnel\",\"Tunneling\",\"Umm Al Hayman Wastewater Treatment Project\"],\"articleSection\":[\"News\",\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185\",\"name\":\"Umm Al Hayman Wastewater Treatment Sea Outfall Tunnel Completed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg\",\"datePublished\":\"2022-05-15T12:29:38+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"description\":\"As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the Sea Outfall tunnel with an internal diameter of 2.2m was completed\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg\",\"width\":1287,\"height\":672,\"caption\":\"Umm Al Hayman Wastewater Treatment Plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=7185#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completion of Sea Outfall Tunnel for Umm Al Hayman Wastewater Treatment Project in Kuwait\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\",\"name\":\"lyndamyer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"lyndamyer\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=2\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Umm Al Hayman Wastewater Treatment Sea Outfall Tunnel Completed","description":"As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the Sea Outfall tunnel with an internal diameter of 2.2m was completed","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=7185","og_locale":"en_US","og_type":"article","og_title":"Umm Al Hayman Wastewater Treatment Sea Outfall Tunnel Completed","og_description":"As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the Sea Outfall tunnel with an internal diameter of 2.2m was completed","og_url":"https:\/\/tunnelingworld.com\/?p=7185","og_site_name":"Tunnelingworld","article_published_time":"2022-05-15T12:29:38+00:00","og_image":[{"width":1287,"height":672,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/05\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg","type":"image\/jpeg"}],"author":"lyndamyer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"lyndamyer","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=7185#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=7185"},"author":{"name":"lyndamyer","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"headline":"Completion of Sea Outfall Tunnel for Umm Al Hayman Wastewater Treatment Project in Kuwait","datePublished":"2022-05-15T12:29:38+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=7185"},"wordCount":138,"commentCount":0,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=7185#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/05\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg","keywords":["Herrenknecht AG AVN","Kuwait","Sea Outfall Tunnel","Tunneling","Umm Al Hayman Wastewater Treatment Project"],"articleSection":["News","Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=7185","url":"https:\/\/tunnelingworld.com\/?p=7185","name":"Umm Al Hayman Wastewater Treatment Sea Outfall Tunnel Completed","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=7185#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=7185#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/05\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg","datePublished":"2022-05-15T12:29:38+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"description":"As a part of the Umm Al Hayman Wastewater Treatment Project in Kuwait, the Sea Outfall tunnel with an internal diameter of 2.2m was completed","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=7185#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=7185"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=7185#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/05\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/05\/Umm-Al-Hayman-Wastewater-Treatment-Plant-1.jpg","width":1287,"height":672,"caption":"Umm Al Hayman Wastewater Treatment Plant"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=7185#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Completion of Sea Outfall Tunnel for Umm Al Hayman Wastewater Treatment Project in Kuwait"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee","name":"lyndamyer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"lyndamyer"},"url":"https:\/\/tunnelingworld.com\/?author=2"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7185"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7185\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/7187"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}