{"id":7058,"date":"2022-04-28T06:16:18","date_gmt":"2022-04-28T06:16:18","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=7058"},"modified":"2022-04-28T06:16:18","modified_gmt":"2022-04-28T06:16:18","slug":"lugoj-deva-section-romania-bucharest-ro-23","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=7058","title":{"rendered":"Lugoj-Deva Section, Romania, Bucharest (ro\/23)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the design and construction of the Lugoj-Deva section, motorway A1, Lot 2 (km27 + 620 \u2013 km 56 + 220): sub-section E and for the completing of the 9.13 km sub-section D, including a 2.13 km tunnel.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this contract is 117 months and the awarded contract budget is EUR524.37 million (RON2.59 bn), excluding VAT.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/e-licitatie.ro\/pub\/notices\/c-notice\/v2\/view\/100141786\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.publications.eu.int\/udl?request=Seek-Deliver&#038;language=en&#038;docid=216992-2022\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-top: 0.75rem; margin-left: 1.5rem;\">Nationala de Admnistrare a Infrastructurii Rutiere SA, attn Horia Mihai Nicolae, Bucarest<br \/>\n&#8211; Tel: <a href=\"tel:+40212643299\">+40 212643299<\/a><br \/>\n&#8211; Fax: +40 212643298,<br \/>\n&#8211; Email: <a href=\"mailto:achizitiipublicebuget@andnet.ro\">achizitiipublicebuget@andnet.ro<\/a><br \/>\n<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for the design and construction of the Lugoj-Deva section, motorway A1, Lot 2 (km27 + 620 \u2013 km 56 + 220): sub-section E and for the completing of the 9.13 km sub-section D, including a 2.13 km tunnel. The determined time duration for this contract is 117 months and the awarded contract budget is EUR524.37 million (RON2.59 bn), excluding VAT. The related tender documents are attached here and here. For further information, please contact: Nationala de Admnistrare a Infrastructurii Rutiere SA, attn Horia Mihai Nicolae, Bucarest &#8211; Tel: +40 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[1891,1892,345,1308,204,47],"class_list":["post-7058","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-design-and-construction","tag-lugoj-deva-section","tag-motorway","tag-romania","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7058"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/7058\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/7060"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}