{"id":6818,"date":"2022-04-03T11:59:57","date_gmt":"2022-04-03T11:59:57","guid":{"rendered":"http:\/\/tunnelingworld.com\/?p=6818"},"modified":"2022-04-03T11:59:57","modified_gmt":"2022-04-03T11:59:57","slug":"grand-paris-express-the-construction-process-of-the-two-branches-has-been-completed-in-university-work-shaft","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=6818","title":{"rendered":"Grand Paris Express: The Construction Process of the Two Branches has been Completed in University Work Shaft"},"content":{"rendered":"<p style=\"text-align: justify;\">Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.<\/p>\n<p style=\"text-align: justify;\">In 2019 the construction process of the University structure commenced in Cr\u00e9teil, with the construction of the underground walls and the boring of the interior space. In 2021 building of the floor, called the raft, at a depth of 31 m completed and gave way to the digging of the branches.<\/p>\n<p><img decoding=\"async\" style=\"display: block; margin: auto;\" src=\"\/wp-content\/uploads\/2022\/04\/University-Work-Construction-Process-1.jpg\" alt=\"University Work Construction Process\" \/><br \/>\n<img decoding=\"async\" style=\"display: block; margin: auto;\" src=\"\/wp-content\/uploads\/2022\/04\/University-Work-Construction-Process-2.jpg\" alt=\"University Work Construction Process\" \/><\/p>\n<p style=\"text-align: justify;\">Responsibilities of these two galleries, which are 10 and 18m long and have been excavated from the bottom of the structure to the tunnel using mechanical shovels, will be connecting the structure to the tunnel of line 15 South, as well as providing ventilation and smoke extraction from the tunnel, and facilitating emergency access and maintenance of the structure.<\/p>\n<p style=\"text-align: justify;\">The construction of the six levels of the interior space of the structure has now been underway since February.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months. In 2019 the construction process of the University structure commenced in Cr\u00e9teil, with the construction of the underground walls and the boring of the interior space. In 2021 building of the floor, called the raft, at a depth of 31 m completed and gave way to the digging of the branches. Responsibilities of these two galleries, which are 10 and 18m long and have been excavated from the bottom of the structure to the tunnel using mechanical shovels, will be connecting the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[981,96,47,1793,1794],"class_list":["post-6818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-france","tag-grand-paris-express","tag-tunneling","tag-underground-galleries","tag-university-work-shaft","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grand Paris Express University Work Shaft Construction Completed<\/title>\n<meta name=\"description\" content=\"Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=6818\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grand Paris Express University Work Shaft Construction Completed\" \/>\n<meta property=\"og:description\" content=\"Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=6818\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-03T11:59:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/04\/Grand-Paris-Express-University-work-Shaft-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"452\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"lyndamyer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lyndamyer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818\"},\"author\":{\"name\":\"lyndamyer\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"headline\":\"Grand Paris Express: The Construction Process of the Two Branches has been Completed in University Work Shaft\",\"datePublished\":\"2022-04-03T11:59:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818\"},\"wordCount\":159,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/Grand-Paris-Express-University-work-Shaft-1.jpg\",\"keywords\":[\"France\",\"Grand-Paris-Express\",\"Tunneling\",\"Underground Galleries\",\"University work Shaft\"],\"articleSection\":[\"News\",\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818\",\"name\":\"Grand Paris Express University Work Shaft Construction Completed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/Grand-Paris-Express-University-work-Shaft-1.jpg\",\"datePublished\":\"2022-04-03T11:59:57+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"description\":\"Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/Grand-Paris-Express-University-work-Shaft-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/Grand-Paris-Express-University-work-Shaft-1.jpg\",\"width\":700,\"height\":452,\"caption\":\"Grand Paris Express University work Shaft\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=6818#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Grand Paris Express: The Construction Process of the Two Branches has been Completed in University Work Shaft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\",\"name\":\"lyndamyer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"lyndamyer\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=2\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grand Paris Express University Work Shaft Construction Completed","description":"Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=6818","og_locale":"en_US","og_type":"article","og_title":"Grand Paris Express University Work Shaft Construction Completed","og_description":"Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.","og_url":"https:\/\/tunnelingworld.com\/?p=6818","og_site_name":"Tunnelingworld","article_published_time":"2022-04-03T11:59:57+00:00","og_image":[{"width":700,"height":452,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/04\/Grand-Paris-Express-University-work-Shaft-1.jpg","type":"image\/jpeg"}],"author":"lyndamyer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"lyndamyer","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=6818#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=6818"},"author":{"name":"lyndamyer","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"headline":"Grand Paris Express: The Construction Process of the Two Branches has been Completed in University Work Shaft","datePublished":"2022-04-03T11:59:57+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=6818"},"wordCount":159,"commentCount":0,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=6818#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/04\/Grand-Paris-Express-University-work-Shaft-1.jpg","keywords":["France","Grand-Paris-Express","Tunneling","Underground Galleries","University work Shaft"],"articleSection":["News","Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=6818","url":"https:\/\/tunnelingworld.com\/?p=6818","name":"Grand Paris Express University Work Shaft Construction Completed","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=6818#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=6818#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/04\/Grand-Paris-Express-University-work-Shaft-1.jpg","datePublished":"2022-04-03T11:59:57+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"description":"Linking the shaft to the line 15 South tunnel, the teams excavated two underground galleries for seven months.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=6818#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=6818"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=6818#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/04\/Grand-Paris-Express-University-work-Shaft-1.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2022\/04\/Grand-Paris-Express-University-work-Shaft-1.jpg","width":700,"height":452,"caption":"Grand Paris Express University work Shaft"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=6818#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Grand Paris Express: The Construction Process of the Two Branches has been Completed in University Work Shaft"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee","name":"lyndamyer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"lyndamyer"},"url":"https:\/\/tunnelingworld.com\/?author=2"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6818"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6818\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/6822"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}