{"id":6637,"date":"2022-03-10T07:58:17","date_gmt":"2022-03-10T07:58:17","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=6637"},"modified":"2022-03-10T07:58:17","modified_gmt":"2022-03-10T07:58:17","slug":"boknafjord-tunnel-norway-rogaland-no-78","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=6637","title":{"rendered":"Boknafjord Tunnel, Norway, Rogaland (no\/78)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the northern part of the Boknafjord Tunnel, part of the E39 Rogfast project (contract E04).<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this contract is until <time datetime=\"2029-10-30\">30\/10\/2029<\/time>.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/eu.eu-supply.com\/app\/rfq\/rwlentrance_s.asp?PID=325134&#038;B=VEGVESEN\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=437806-2018\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\"><span>For further information, please contact:<\/span><br \/>\n<span style=\"display: inline-block; margin-top: 0.75rem; margin-left: 1.5rem;\">Norwegian Public Roads Administration, att.n Kristine Hamre, Moss<br \/>\n&#8211; Email: <a href=\"mailto:kristine.hamre@vegvesen.no\">kristine.hamre@vegvesen.no<\/a><br \/>\n<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for the northern part of the Boknafjord Tunnel, part of the E39 Rogfast project (contract E04). The determined time duration for this contract is until 30\/10\/2029. The related tender documents are attached here and here. For further information, please contact: Norwegian Public Roads Administration, att.n Kristine Hamre, Moss &#8211; Email: kristine.hamre@vegvesen.no<\/p>\n","protected":false},"author":2,"featured_media":6639,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[1735,1738,244,794,204,47],"class_list":["post-6637","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-boknafjord-tunnel","tag-e39-rogfast-project","tag-norway","tag-road-and-motorway","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6637"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6637\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/6639"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}