{"id":6274,"date":"2022-02-09T10:13:58","date_gmt":"2022-02-09T10:13:58","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=6274"},"modified":"2022-02-09T10:13:58","modified_gmt":"2022-02-09T10:13:58","slug":"concluding-the-contract-of-torino-metro-cbtc","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=6274","title":{"rendered":"Concluding the Contract of Torino Metro CBTC"},"content":{"rendered":"<p style=\"text-align: justify;\">In order to provide the latest generation of communications-based train control and four additional trainsets for the automated rubber-typed light metro Line 1, the city of Torino\u2019s infrastructure manager Infra.To has granted a turnkey contract with \u20ac156m value to <a href=\"https:\/\/www.alstom.com\/\" target=\"_blank\" rel=\"noopener\">Alstom<\/a>.<\/p>\n<p style=\"text-align: justify;\">Backing GoA4 unattended automatic operation, the CBTC is due to replace the available signaling on the 15\u00b71 km line, and will be installed on a 3\u00b74 km stretch from Fermi to Cascine Vica which is under construction.<\/p>\n<p style=\"text-align: justify;\">Equipping the metro\u2019s existing fleet of VAL208 cars supplied by Siemens, the Metropolis trainsets will have a total capacity of 320 passengers, with wide gangways and dedicated areas for people with reduced mobility. Features will include multimedia passenger information displays and CCTV.<\/p>\n<p style=\"text-align: justify;\">The contents of the revealed contract on February 4 are an option for 12 more trains, and installing the CBTC in a depot that is under construction.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to provide the latest generation of communications-based train control and four additional trainsets for the automated rubber-typed light metro Line 1, the city of Torino\u2019s infrastructure manager Infra.To has granted a turnkey contract with \u20ac156m value to Alstom. Backing GoA4 unattended automatic operation, the CBTC is due to replace the available signaling on the 15\u00b71 km line, and will be installed on a 3\u00b74 km stretch from Fermi to Cascine Vica which is under construction. Equipping the metro\u2019s existing fleet of VAL208 cars supplied by Siemens, the Metropolis trainsets will have a total capacity of 320 passengers, with [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6276,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[1623,246,223,1624,47],"class_list":["post-6274","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-cbtc","tag-contract","tag-italy","tag-torino-metro","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6274"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6274\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/6276"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}