{"id":6126,"date":"2022-01-29T07:25:19","date_gmt":"2022-01-29T07:25:19","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=6126"},"modified":"2022-01-29T07:25:19","modified_gmt":"2022-01-29T07:25:19","slug":"espoo-salo-line-finland-helsinki-western-finland-fi-27","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=6126","title":{"rendered":"Espoo-Salo Line, Finland, Helsinki -Western Finland (fi\/27)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for further studies for a master plan for the Espoo-Salo straight line, belonging to the future high speed railway from Helsinki-Turku.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/www.esourcing2.fi\/prod\/Account\/logon\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=039366-2022\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\"><span>For further information, please contact:<\/span><br \/>\n<span style=\"display: inline-block; margin-top:0.75rem; margin-left: 1.5rem;\">Turun Tunnin Juna Oy, Espoo,<br \/>\n&#8211; Email: <a href=\"mailto:info@hankintajuristit.fi\">info@hankintajuristit.fi<\/a><br \/>\n<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for further studies for a master plan for the Espoo-Salo straight line, belonging to the future high speed railway from Helsinki-Turku. The related tender documents are attached here and here. For further information, please contact: Turun Tunnin Juna Oy, Espoo, &#8211; Email: info@hankintajuristit.fi<\/p>\n","protected":false},"author":2,"featured_media":6128,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[1566,1567,1568,323,204,47],"class_list":["post-6126","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-espoo-salo-straight-line","tag-finland","tag-helsinki-turku","tag-high-speed-railway","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6126"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/6126\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/6128"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}