{"id":5995,"date":"2022-01-19T09:50:15","date_gmt":"2022-01-19T09:50:15","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=5995"},"modified":"2022-01-19T09:50:15","modified_gmt":"2022-01-19T09:50:15","slug":"metro-line-3-poland-warsaw-pl-11","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=5995","title":{"rendered":"Metro Line 3, Poland, Warsaw (pl\/11)"},"content":{"rendered":"<p style=\"text-align: justify;\">The contract with EUR 3.44 million (PLN15.62 million) budget, excluding VAT, for the pre-design works for the First Stage of the metro Line 3 in Warsaw, involving an 8 km section with 6 stations (Dworzec Wschodni, Mi\u0144ska, Rondo Wiatraczna, Ostrobramska, Jana Nowaka-Jeziora\u0144ski and Goc\u0142aw) and the Kozia Gorka Technical and Parking Station (STP), has been awarded by the ILF Consulting Engineers Polska Sp.z.o.o. from Warsaw.<\/p>\n<p style=\"text-align: justify;\"><span>For more details, please connect:<\/span><br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Metro Warszawskie, Warsaw<br \/>\n&#8211; Tel: <a href=\"tel:+48226554677\">+48226554677<\/a><br \/>\n&#8211; Email: <a href=\"mailto:zam-eh@metro.waw.pl\"zam-eh@metro.waw.pl<\/a><br \/>\n<\/span><\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=632262-2021\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contract with EUR 3.44 million (PLN15.62 million) budget, excluding VAT, for the pre-design works for the First Stage of the metro Line 3 in Warsaw, involving an 8 km section with 6 stations (Dworzec Wschodni, Mi\u0144ska, Rondo Wiatraczna, Ostrobramska, Jana Nowaka-Jeziora\u0144ski and Goc\u0142aw) and the Kozia Gorka Technical and Parking Station (STP), has been awarded by the ILF Consulting Engineers Polska Sp.z.o.o. from Warsaw. For more details, please connect: Metro Warszawskie, Warsaw &#8211; Tel: +48226554677 &#8211; Email:<\/p>\n","protected":false},"author":2,"featured_media":5997,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[553,1516,51,260,47],"class_list":["post-5995","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-awards","tag-first-stage-of-the-metro-line-3-in-warsaw","tag-metro","tag-poland","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5995","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5995"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/5997"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}