{"id":5860,"date":"2022-01-05T10:49:23","date_gmt":"2022-01-05T10:49:23","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=5860"},"modified":"2022-01-05T10:49:23","modified_gmt":"2022-01-05T10:49:23","slug":"namma-bangalore-metro-latest-tunneling-updates","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=5860","title":{"rendered":"Namma\/Bangalore Metro Latest tunneling updates"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<span>Construction responsibility of the 3.655 Kms among South Ramp to Rashtriya Military School (RT-01 Package), which comprises of the 3 underground stations Diary Circle, Mico Industries and Langford Town is up to M\/S Afcons Infrastructure LTD:<\/span><br \/>\n<span style=\"display: inline-block; margin-top: 0.75rem;\"><\/p>\n<ul>\n<li>Completing the North Bound tunnel with 595 m length, TBM Varada reached the Langford Town Station on 11 November 2021, while it has to restart towards the Rashtriya Military School -Launching Shaft to drive the South tunnel. <\/li>\n<li>Following this On 12 November 2021 TBM Rudra completed the 614.60 m tunnel that stretches from the South ramp near Karmika Bhavana to Dairy Circle and the next destination of this machine is northwards to Mico Industries (Lakkasandra) and Langford Town.<\/li>\n<li>Tunneling 443,80 m of its tunnel for the South Bound from South Ramp to Dairy Circle, TBM Vamika attained a 72.30% of progress.<\/li>\n<\/ul>\n<p><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n<span>Additionally, the KRashtriya Military School to Shivajinagar section (RT-02 Package) with 2.762 km, that includes the 3 underground stations Rashtriya Military School, MG Road e Shivajinagar, are the subsets of M\/S Larson &#038; Toubro Ltd &#8216;s operations:<\/span><br \/>\n<span style=\"display: inline-block; margin-top: 0.75rem;\"><\/p>\n<ul>\n<li>In November TBM Avni, which is digging from Shivajinagar, broke through at the MG Road station ahead of pursuing towards Rashtriya Military School. The TBM had tunneled 929.20 m with 86,5\u2019% of its tunnel length completed for the South Bound tunnel.<\/li>\n<li>The excavation path of TBM Lavi is from Shivajinagar to Rashtriya Military School and currently 633.60 m of the North bound tunnel has been dug by this TBM while the 59% of length of the tunnel has been completed.<\/li>\n<\/ul>\n<p><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n<span>M\/S ITD Cementation India Ltd is advancing the works process on the 4.591 Kms South of Tannery Road Station to North Ramp (RT-04 Package), including 4 underground stations Tannery Road, Venkateshpura, Kadugondanahalli &#038; Nagawara:  <\/span><br \/>\n<span style=\"display: inline-block; margin-top: 0.75rem;\"><\/p>\n<ul>\n<li>The launching shaft of Venkateshpura Station was the commencing location of TBM Bhadra on 17\/06\/2021, while it has completed 16% of its journey due to boring 203 m south bound towards the retrieval shaft.<\/li>\n<li>The completion track of TBM Tunga was 117.60 m of the North Bound tunnel from Venkateshpura Station to its retrieval shaft.<\/li>\n<\/ul>\n<p><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction responsibility of the 3.655 Kms among South Ramp to Rashtriya Military School (RT-01 Package), which comprises of the 3 underground stations Diary Circle, Mico Industries and Langford Town is up to M\/S Afcons Infrastructure LTD: Completing the North Bound tunnel with 595 m length, TBM Varada reached the Langford Town Station on 11 November 2021, while it has to restart towards the Rashtriya Military School -Launching Shaft to drive the South tunnel. Following this On 12 November 2021 TBM Rudra completed the 614.60 m tunnel that stretches from the South ramp near Karmika Bhavana to Dairy Circle and the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5863,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[55,1462,1463,84,47],"class_list":["post-5860","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-india","tag-latest-tunneling-updates","tag-namma-bangalore-metro","tag-tbm","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5860"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5860\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/5863"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}