{"id":5580,"date":"2021-12-09T05:25:21","date_gmt":"2021-12-09T05:25:21","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=5580"},"modified":"2021-12-09T05:25:21","modified_gmt":"2021-12-09T05:25:21","slug":"azerbaijans-declarations-about-advancement-of-tunnel-road-among-goygol-and-kalbajar","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=5580","title":{"rendered":"Azerbaijan&#8217;s Declarations about Advancement of Tunnel Road Among Goygol and Kalbajar"},"content":{"rendered":"<p style=\"text-align: justify;\">According to deputy head of the Main Operation and Road Repair Department of the Azerbaijani State Agency of Automobile Roads Hidayat Rustamov&#8217;s interview with REAL TV Trend, the construction process of 11.5 km road tunnel that stretches from Toghanaly village in Azerbaijan\u2019s Goygol towards Kalbajar district is undergoing rapidly.<\/p>\n<p style=\"text-align: justify;\">Rustamov continued: &#8220;The road is being laid through steep rocks, and its 500-meter section has been already built. The work is carried out in three shifts. The road should be commissioned in 2025. A Turkish company was invited to build a tunnel on the road with a total length of 80.7 kilometers.&#8221;<\/p>\n<p style=\"text-align: justify;\">&#8220;After the tunnel is built, construction of a 26-kilometer road from Kalbajar [city] to Istisu [village], and further from Kalbajar to Lachin, will begin. The road will stretch to the airport, which will be built in Lachin district,&#8221; he added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to deputy head of the Main Operation and Road Repair Department of the Azerbaijani State Agency of Automobile Roads Hidayat Rustamov&#8217;s interview with REAL TV Trend, the construction process of 11.5 km road tunnel that stretches from Toghanaly village in Azerbaijan\u2019s Goygol towards Kalbajar district is undergoing rapidly. Rustamov continued: &#8220;The road is being laid through steep rocks, and its 500-meter section has been already built. The work is carried out in three shifts. The road should be commissioned in 2025. A Turkish company was invited to build a tunnel on the road with a total length of 80.7 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5581,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[1339,1340,1341,1342,47],"class_list":["post-5580","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-azerbaijan","tag-between-goygol-and-kalbajar","tag-toghanaly-village","tag-tunnel-road","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5580"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5580\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/5581"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}