{"id":5442,"date":"2021-11-29T06:53:57","date_gmt":"2021-11-29T06:53:57","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=5442"},"modified":"2021-11-29T06:53:57","modified_gmt":"2021-11-29T06:53:57","slug":"norway-vestland-county-tender-no-274","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=5442","title":{"rendered":"Norway, Vestland County Tender (no\/274)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for operation and maintenance tasks related to electrical installations, including Control, Regulation and Monitoring systems (Norwegian: SRO), on roads, tunnels and bridges in Vestland County.<\/p>\n<p style=\"text-align: justify;\">The determined time period for this contract is from 01\/06\/2022 to 31\/05\/2027.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=598872-2021\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<\/p>\n<p style=\"text-align: justify;\">Vestland County Municipality, attn Geir Sveinung Alme, Bergen<br \/>\n&#8211; Email: <a href=\"mailto:geir.sveinung.alme@vlfk.no\">Geir.Sveinung.Alme@vlfk.no<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for operation and maintenance tasks related to electrical installations, including Control, Regulation and Monitoring systems (Norwegian: SRO), on roads, tunnels and bridges in Vestland County. The determined time period for this contract is from 01\/06\/2022 to 31\/05\/2027. The related tender documents are attached here. For further information, please contact: Vestland County Municipality, attn Geir Sveinung Alme, Bergen &#8211; Email: Geir.Sveinung.Alme@vlfk.no<\/p>\n","protected":false},"author":2,"featured_media":5443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[1279,1280,101,47,1281],"class_list":["post-5442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-norway-tender","tag-operation-and-maintenance","tag-road","tag-tunneling","tag-vestland-county","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5442"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/5442\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/5443"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}