{"id":4072,"date":"2021-07-24T12:06:40","date_gmt":"2021-07-24T12:06:40","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=4072"},"modified":"2021-07-24T12:06:40","modified_gmt":"2021-07-24T12:06:40","slug":"light-house-underground-stations-india-chennai","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=4072","title":{"rendered":"Light House Underground Stations, India, Chennai"},"content":{"rendered":"<p>The deadline of the open tender for constructing 4 underground stations at Light House, Kutchery Road, Alwarpet, and Bharathidasan Road has been postponed from 18\/06\/2021 to 02\/08\/2021. It includes an underground stabling yard and a cross-over at Light House Station and a related 5.15km twin tunnel from km0+001 to km5+150 for the Chennai metro (Down line). The duration of the contract is two years.<\/p>\n<p>If you are interested, you can contact Chennai Metro Rail Ltd.<\/p>\n<p style=\"padding-left: 40px;\">&#8211; Tel: 044-2379 2000<br \/>\n&#8211; Extn: 22347<br \/>\n&#8211; Fax: 044-2379 2200<br \/>\n&#8211; Email: <a href=\"mailto:gurunath.reddy@cmrl.in\">gurunath.reddy@cmrl.in<\/a><\/p>\n<p>For more information on the tender, please click <a href=\"https:\/\/eprocure.gov.in\/eprocure\/app\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The deadline of the open tender for constructing 4 underground stations at Light House, Kutchery Road, Alwarpet, and Bharathidasan Road has been postponed from 18\/06\/2021 to 02\/08\/2021. It includes an underground stabling yard and a cross-over at Light House Station and a related 5.15km twin tunnel from km0+001 to km5+150 for the Chennai metro (Down line). The duration of the contract is two years. If you are interested, you can contact Chennai Metro Rail Ltd. &#8211; Tel: 044-2379 2000 &#8211; Extn: 22347 &#8211; Fax: 044-2379 2200 &#8211; Email: gurunath.reddy@cmrl.in For more information on the tender, please click here.<\/p>\n","protected":false},"author":3,"featured_media":4071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[626,55,627],"class_list":["post-4072","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-chennai","tag-india","tag-light-house-underground-stations","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/4072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4072"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/4072\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/4071"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}