{"id":3698,"date":"2021-06-16T15:45:59","date_gmt":"2021-06-16T15:45:59","guid":{"rendered":"http:\/\/tunnelingworld.com\/?p=3698"},"modified":"2021-06-16T15:45:59","modified_gmt":"2021-06-16T15:45:59","slug":"switzerland-bern-ch-55","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=3698","title":{"rendered":"Switzerland, Bern &#8211; ch\/55"},"content":{"rendered":"<p style=\"text-align: justify;\">Open tender has been announced for the upgrading of the railway Schanzen tunnel (1318 m), part of the expansion of the Bern RBS station (Lot 2.3). A mandatory inspection will take place on 23\/07\/2021 at 9:00 a.m. at the site: registration by 13\/07\/2021 at <a href=\"mailto:ABBernRBS@rbs.ch\">ABBernRBS@rbs.ch<\/a>. The deadline is 24\/09\/2021. A period of 19 months is estimated for the project.<\/p>\n<p style=\"text-align: justify;\">Below you can find the contact information:<\/p>\n<p style=\"text-align: justify;\">Regionalverkehr Bern-Solothurn AG (RBS), Worblaufen<\/p>\n<p style=\"text-align: justify;\">Email: <a href=\"mailto:ABBernRBS@rbs.ch\">ABBernRBS@rbs.ch<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information on the tender please click <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&amp;language=en&amp;docid=298297-2021\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&amp;language=en&amp;docid=298297-2021\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Open tender has been announced for the upgrading of the railway Schanzen tunnel (1318 m), part of the expansion of the Bern RBS station (Lot 2.3). A mandatory inspection will take place on 23\/07\/2021 at 9:00 a.m. at the site: registration by 13\/07\/2021 at ABBernRBS@rbs.ch. The deadline is 24\/09\/2021. A period of 19 months is estimated for the project. Below you can find the contact information: Regionalverkehr Bern-Solothurn AG (RBS), Worblaufen Email: ABBernRBS@rbs.ch. For further information on the tender please click here and here.<\/p>\n","protected":false},"author":2,"featured_media":3700,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[490,294,346,68,47],"class_list":["post-3698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bern","tag-railway","tag-switzerland","tag-tunnel","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3698"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/3700"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}