{"id":3686,"date":"2021-06-14T15:03:09","date_gmt":"2021-06-14T15:03:09","guid":{"rendered":"http:\/\/tunnelingworld.com\/?p=3686"},"modified":"2021-06-14T15:03:09","modified_gmt":"2021-06-14T15:03:09","slug":"india-himachal-pradesh-in-93","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=3686","title":{"rendered":"India, Himachal Pradesh &#8211; in\/93"},"content":{"rendered":"<p style=\"text-align: justify;\">An open tender has been announced for Project Management Consultancy Services for construction of the 4.2km-length and 2- lane tunnel including approaches across the Jalori Pass on Sainj (0.00)-Luhri- Aut (97.00) Highway NH-305 from Km 46.080 to Km 57.00 in the State of Himachal Pradesh. The pre-bid meeting is scheduled on 14.06.2021 at 15:00 Hrs. The determined time period for this project is 170 months: 10 months for DPR+4 months for preconstruction activity+36 months for the construction + 10 years for maintenance.<\/p>\n<p style=\"text-align: justify;\">Further information can be reached in below addresses:<\/p>\n<p style=\"text-align: justify;\">Closing Date: 05.07.2021<\/p>\n<p style=\"text-align: justify;\">Government of India, Ministry of Road Transport &amp; Highways (Zone-I)II n.1, New Delhi.)<\/p>\n<p style=\"text-align: justify;\">For more tender data, please click <a href=\"https:\/\/infracon.nic.in\/WriteReadData\/consultantprojectsDPR\/2097_FileM2980538602.pdf\">here<\/a> and <a href=\"https:\/\/morth.nic.in\/sites\/default\/files\/pribid.pdf\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An open tender has been announced for Project Management Consultancy Services for construction of the 4.2km-length and 2- lane tunnel including approaches across the Jalori Pass on Sainj (0.00)-Luhri- Aut (97.00) Highway NH-305 from Km 46.080 to Km 57.00 in the State of Himachal Pradesh. The pre-bid meeting is scheduled on 14.06.2021 at 15:00 Hrs. The determined time period for this project is 170 months: 10 months for DPR+4 months for preconstruction activity+36 months for the construction + 10 years for maintenance. Further information can be reached in below addresses: Closing Date: 05.07.2021 Government of India, Ministry of Road Transport [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3687,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[159,485,55,204,47],"class_list":["post-3686","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","tag-highway","tag-himachal-pradesh","tag-india","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3686"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3686\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/3687"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}