{"id":3504,"date":"2021-05-23T08:30:16","date_gmt":"2021-05-23T08:30:16","guid":{"rendered":"http:\/\/tunnelingworld.com\/?p=3504"},"modified":"2021-05-23T08:30:16","modified_gmt":"2021-05-23T08:30:16","slug":"norway-nordland-troms-counties-no-266","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=3504","title":{"rendered":"Norway, Nordland &#038; Troms Counties &#8211; no\/266"},"content":{"rendered":"<p style=\"text-align: justify;\">An open tender has been announced for the PPP Contract on design and engineering, construction, financing, operation and maintenance of the E10\/Rv85 Tjeldsund-Gullesfjordbotn-Langvassbukt (Halogaland Road\/Halogalandsvegen) project. A total of 82 km of new road will be built, including 27 km through a total of 7 tunnels. Of the remaining, 35 km will be built in the current road line, while 20 km will be laid in a new road line. The determined time period for this project is from 01\/05\/2023 to 31\/12\/2029.<\/p>\n<p style=\"text-align: justify;\">Further information can be reached in below addresses:<\/p>\n<p style=\"text-align: justify;\">Norwegian Public Roads Administration, attn Goran Sofienlund, Lillehammer<\/p>\n<p style=\"text-align: justify;\">Closing Date: 01.09.2021<\/p>\n<p style=\"text-align: justify;\">Email: <a href=\"mailto:goran.sofienlund@vegvesen.no\">goran.sofienlund@vegvesen.no<\/a><\/p>\n<p style=\"text-align: justify;\">For more tender data, please click <a href=\"http:\/\/eu.eu-supply.com\/app\/rfq\/rwlentrance_s.asp?PID=298677&amp;B=VEGVESEN\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&amp;language=en&amp;docid=252141-2021\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An open tender has been announced for the PPP Contract on design and engineering, construction, financing, operation and maintenance of the E10\/Rv85 Tjeldsund-Gullesfjordbotn-Langvassbukt (Halogaland Road\/Halogalandsvegen) project. A total of 82 km of new road will be built, including 27 km through a total of 7 tunnels. Of the remaining, 35 km will be built in the current road line, while 20 km will be laid in a new road line. The determined time period for this project is from 01\/05\/2023 to 31\/12\/2029. Further information can be reached in below addresses: Norwegian Public Roads Administration, attn Goran Sofienlund, Lillehammer Closing Date: [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3505,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[],"class_list":["post-3504","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3504"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3504\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/3505"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}