{"id":3072,"date":"2021-03-13T10:51:06","date_gmt":"2021-03-13T10:51:06","guid":{"rendered":"http:\/\/tunnelingworld.com\/?p=3072"},"modified":"2021-03-13T10:51:06","modified_gmt":"2021-03-13T10:51:06","slug":"starting-china-tibet-bullet-trains-operations-before-july","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=3072","title":{"rendered":"Starting China-Tibet bullet train&#8217;s operations before July"},"content":{"rendered":"<p style=\"text-align: justify;\">According to reports, China State Railway Group, also known as China Railway (CR), aims to operate bullet trains to Tibet before July.<\/p>\n<p style=\"text-align: justify;\">This will mark the start of high-speed train services to all mainland provincial-level regions.<\/p>\n<p style=\"text-align: justify;\">CR board chairman Lu Dongfu stated: &#8220;Fuxing high-speed trains, powered by both electricity and internal combustion, will operate on a 435km rail track to the provincial capital of Lhasa.&#8221;<\/p>\n<p style=\"text-align: justify;\">The commencement date of construction process on the railway line, which will link Lhasa with Nyingchi in eastern Tibet, was the 2014. The track-laying work was ended by the end of last year. Demarcation the first electrified railroad in Tibet, this railway project will start its operations in June.<\/p>\n<p style=\"text-align: justify;\">In accordance to Tibet Railway Construction Company&#8217;s statement, a subsidiary of China State Railway Group, the high-speed trains will work at a speed of 160 km\/h.<\/p>\n<p style=\"text-align: justify;\">The main purpose of this country is to increase the total length of its high-speed train network from 37,900km to around 50,000km by 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to reports, China State Railway Group, also known as China Railway (CR), aims to operate bullet trains to Tibet before July. This will mark the start of high-speed train services to all mainland provincial-level regions. CR board chairman Lu Dongfu stated: &#8220;Fuxing high-speed trains, powered by both electricity and internal combustion, will operate on a 435km rail track to the provincial capital of Lhasa.&#8221; The commencement date of construction process on the railway line, which will link Lhasa with Nyingchi in eastern Tibet, was the 2014. The track-laying work was ended by the end of last year. Demarcation the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3073,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[120,293,294,295],"class_list":["post-3072","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","tag-china","tag-high-speed-train","tag-railway","tag-tibet-bullet-train","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3072"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/3072\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/3073"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}