{"id":2289,"date":"2020-10-15T09:54:46","date_gmt":"2020-10-15T09:54:46","guid":{"rendered":"http:\/\/tunnelingworld.com\/?p=2289"},"modified":"2020-10-15T09:54:46","modified_gmt":"2020-10-15T09:54:46","slug":"high-speed-2-third-contract-signed-by-the-french-company-cbe-group","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=2289","title":{"rendered":"High Speed 2: Third Contract Signed by the French Company CBE Group"},"content":{"rendered":"<p style=\"text-align: justify;\">Work on the first phase of High Speed 2, the highly significant mega-project in the UK, progresses.<\/p>\n<p style=\"text-align: justify;\">Upon completing this stage between 2029 and 2023, a new high-speed railway line will be built, connecting metropolitan areas, including <em>Birmingham, London, Manchester, and Leeds<\/em>.<\/p>\n<p style=\"text-align: justify;\"><strong>CBE Group<\/strong>, a French company, was chosen as the preferred contractor alongside <strong>ALIGN JV<\/strong> for the C1 Lot in 2019. However, it has succeeded in sealing a second deal associated with 2 lots, <strong>The Bromford Lot<\/strong>, and <strong>The Long Itchington Lot<\/strong>, providing moulds and carousels for 3 lots in total.<\/p>\n<p style=\"text-align: justify;\">Estefania Palacios, CBE Project Manager for the C1 and Long Itchington lots, explained: <em>\u00ab The main challenges are the complexity of English norms, high tolerance requirements, and administrative management, especially for shipping, because of Brexit. \u00bb<\/em><\/p>\n<p style=\"text-align: justify;\">The company has a great journey ahead as it plans to enter the fourth round of negotiations to construct the next Lot of Europe&#8217;s biggest infrastructure project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work on the first phase of High Speed 2, the highly significant mega-project in the UK, progresses. Upon completing this stage between 2029 and 2023, a new high-speed railway line will be built, connecting metropolitan areas, including Birmingham, London, Manchester, and Leeds. CBE Group, a French company, was chosen as the preferred contractor alongside ALIGN JV for the C1 Lot in 2019. However, it has succeeded in sealing a second deal associated with 2 lots, The Bromford Lot, and The Long Itchington Lot, providing moulds and carousels for 3 lots in total. Estefania Palacios, CBE Project Manager for the C1 [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":2290,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[],"class_list":["post-2289","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/2289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2289"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/2289\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/2290"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}