{"id":20997,"date":"2026-11-27T10:13:03","date_gmt":"2026-11-27T10:13:03","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20997"},"modified":"2026-11-27T10:13:03","modified_gmt":"2026-11-27T10:13:03","slug":"haitai-yangtze-river-tunnel-completes-first-under-river-tbm-drive","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20997","title":{"rendered":"Haitai Yangtze River Tunnel Completes First Under-River TBM Drive"},"content":{"rendered":"<p>The Haitai Yangtze River Tunnel has reached a major construction milestone, with the first of its two bores successfully completing its crossing beneath the Yangtze River in eastern China.<\/p>\n<p>Named Jianghai, the 16.64m-diameter tunnel boring machine (TBM) reached the southern riverbank at Taicang, Jiangsu Province, on 26 November 2026, completing a 7.46km drive beneath the river. The machine excavated the right-hand bore of the project.<\/p>\n<p>Jointly developed by China Railway Construction Heavy Industry Corp (CRCHI) and China Railway 14th Bureau Group, Jianghai began excavation in April 2025 and entered the under-river section in September of the same year. It achieved an average advance rate of approximately 20m per day.<\/p>\n<p>During the drive, the TBM encountered challenging geological conditions, including layers of silt and fine sand, as well as high groundwater pressure. At its deepest point, the machine operated approximately 75m below the riverbed, where water and ground pressure reached around 7.5 bar.<\/p>\n<p>The Haitai Yangtze River Tunnel forms part of a major road link connecting Haimen in Nantong, on the northern bank of the Yangtze, with Taicang and Changshu in Suzhou to the south.<\/p>\n<p>The overall project extends approximately 39.07km and includes an 11.185km underwater section comprising two parallel bores. Designed as a six-lane highway with a speed limit of 100km\/h, the tunnel will improve cross-river connectivity across the Yangtze River Delta.<\/p>\n<p>Once operational, the new link is expected to reduce travel times between Nantong, southern Jiangsu and Shanghai, while strengthening transport connections across the region.<\/p>\n<p>The completion of the first under-river drive marks a significant milestone, although excavation and construction of the second bore and the remaining tunnel sections are still required before the project can be completed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Haitai Yangtze River Tunnel has reached a major construction milestone, with the first of its two bores successfully completing its crossing beneath the Yangtze River in eastern China. Named Jianghai, the 16.64m-diameter tunnel boring machine (TBM) reached the southern riverbank at Taicang, Jiangsu Province, on 26 November 2026, completing a 7.46km drive beneath the river. The machine excavated the right-hand bore of the project. Jointly developed by China Railway Construction Heavy Industry Corp (CRCHI) and China Railway 14th Bureau Group, Jianghai began excavation in April 2025 and entered the under-river section in September of the same year. It achieved [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20998,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[120,4349,2726,4588,4589,5882,6032],"class_list":["post-20997","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","tag-china","tag-china-railway-14th-bureau","tag-crchi","tag-haitai-yangtze-river-tunnel","tag-jianghai-tbm","tag-underwater-tunnelling","tag-yangtze-river","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Haitai Yangtze River Tunnel Completes First TBM Drive<\/title>\n<meta name=\"description\" content=\"The 16.64m-diameter Jianghai TBM completes a 7.46km drive beneath the Yangtze River for China&#039;s Haitai underwater road tunnel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20997\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Haitai Yangtze River Tunnel Completes First TBM Drive\" \/>\n<meta property=\"og:description\" content=\"The 16.64m-diameter Jianghai TBM completes a 7.46km drive beneath the Yangtze River for China&#039;s Haitai underwater road tunnel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20997\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-27T10:13:03+00:00\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Haitai Yangtze River Tunnel Completes First Under-River TBM Drive\",\"datePublished\":\"2026-11-27T10:13:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997\"},\"wordCount\":285,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-2.avif\",\"keywords\":[\"China\",\"China Railway 14th Bureau\",\"CRCHI\",\"Haitai Yangtze River Tunnel\",\"Jianghai TBM\",\"underwater tunnelling\",\"Yangtze River\"],\"articleSection\":[\"Contract\\\/projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997\",\"name\":\"Haitai Yangtze River Tunnel Completes First TBM Drive\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-2.avif\",\"datePublished\":\"2026-11-27T10:13:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"The 16.64m-diameter Jianghai TBM completes a 7.46km drive beneath the Yangtze River for China's Haitai underwater road tunnel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-2.avif\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-2.avif\",\"width\":894,\"height\":651,\"caption\":\"Haitai Yangtze River Tunnel\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20997#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Haitai Yangtze River Tunnel Completes First Under-River TBM Drive\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Haitai Yangtze River Tunnel Completes First TBM Drive","description":"The 16.64m-diameter Jianghai TBM completes a 7.46km drive beneath the Yangtze River for China's Haitai underwater road tunnel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20997","og_locale":"en_US","og_type":"article","og_title":"Haitai Yangtze River Tunnel Completes First TBM Drive","og_description":"The 16.64m-diameter Jianghai TBM completes a 7.46km drive beneath the Yangtze River for China's Haitai underwater road tunnel.","og_url":"https:\/\/tunnelingworld.com\/?p=20997","og_site_name":"Tunnelingworld","article_published_time":"2026-11-27T10:13:03+00:00","author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20997#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20997"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Haitai Yangtze River Tunnel Completes First Under-River TBM Drive","datePublished":"2026-11-27T10:13:03+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20997"},"wordCount":285,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20997#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-2.avif","keywords":["China","China Railway 14th Bureau","CRCHI","Haitai Yangtze River Tunnel","Jianghai TBM","underwater tunnelling","Yangtze River"],"articleSection":["Contract\/projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20997","url":"https:\/\/tunnelingworld.com\/?p=20997","name":"Haitai Yangtze River Tunnel Completes First TBM Drive","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20997#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20997#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-2.avif","datePublished":"2026-11-27T10:13:03+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"The 16.64m-diameter Jianghai TBM completes a 7.46km drive beneath the Yangtze River for China's Haitai underwater road tunnel.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20997#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20997"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20997#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-2.avif","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-2.avif","width":894,"height":651,"caption":"Haitai Yangtze River Tunnel"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20997#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Haitai Yangtze River Tunnel Completes First Under-River TBM Drive"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20997"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20997\/revisions"}],"predecessor-version":[{"id":20999,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20997\/revisions\/20999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20998"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}