{"id":20951,"date":"2026-11-18T13:34:28","date_gmt":"2026-11-18T13:34:28","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20951"},"modified":"2026-11-18T13:34:28","modified_gmt":"2026-11-18T13:34:28","slug":"va-syd-withdraws-procurement-for-maxima-wastewater-tunnels-in-sweden","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20951","title":{"rendered":"VA SYD withdraws procurement for MAXIMA wastewater tunnels in Sweden"},"content":{"rendered":"<p data-pm-slice=\"1 1 []\">Swedish water and waste management company VA SYD has withdrawn the contract notice for the wastewater tunnels and shafts forming part of its MAXIMA wastewater treatment system, following a reassessment of project risks.<\/p>\n<p>The procurement notice was published in early June but has since been withdrawn after uncertainties emerged over access to land required for the construction of tunnel shafts.<\/p>\n<p>According to MAXIMA programme director Christer Hallgren, the risk was identified during preparations for the environmental permit application and the process of securing utility easements. VA SYD concluded that proceeding with the existing procurement strategy would expose the project to excessive cost risks.<\/p>\n<p>The company said that the processes for obtaining utility easements and environmental permits are continuing as planned. Work is also under way to clarify the conditions and develop a strategy to ensure that land access does not delay the project.<\/p>\n<h5>MAXIMA wastewater infrastructure scheme<\/h5>\n<p>The MAXIMA programme is designed to meet the wastewater treatment needs of the municipalities of Burl\u00f6v, Lomma, Lund and Malm\u00f6, as well as receive wastewater from parts of Staffanstorp and Svedala.<\/p>\n<p>The scheme comprises several major infrastructure components:<\/p>\n<ul data-spread=\"false\">\n<li>A new Sj\u00f6lunda wastewater treatment plant in Malm\u00f6, including new outfall pipelines into the \u00d6resund.<\/li>\n<li>A new large pumping station at Sj\u00f6lunda.<\/li>\n<li>A southern wastewater tunnel beneath Malm\u00f6.<\/li>\n<li>A northern wastewater tunnel connecting Lund to Sj\u00f6lunda.<\/li>\n<li>A pressurised wastewater transfer pipeline from Borgeby.<\/li>\n<\/ul>\n<h5>Southern wastewater tunnel: Malm\u00f6\u2013Sj\u00f6lunda<\/h5>\n<p>The southern tunnel will run approximately 5.5km from Turbinen in central Malm\u00f6 to Sj\u00f6lunda. The main tunnel will have a diameter of 5m and will be connected to two micro-tunnels, each 2m in diameter, with a combined length of 2.4km.<\/p>\n<p>The tunnel will be excavated at depths of approximately 20\u201335m and is designed to provide a storage capacity of 100,000m\u00b3.<\/p>\n<p>Eleven shafts are planned along the alignment. The shaft near Sj\u00f6lunda will have a diameter of 45m to accommodate the new pumping station, while the remaining shafts will range from 4m to 15m in diameter.<\/p>\n<h5>Northern wastewater tunnel: Lund\u2013Sj\u00f6lunda<\/h5>\n<p>The northern tunnel will extend approximately 10km between the K\u00e4llby treatment plant in Lund and the new Sj\u00f6lunda facility. It will be constructed at depths of approximately 20\u201335m, with an internal diameter of 3m and a planned storage capacity of 80,000m\u00b3.<\/p>\n<p>Four shafts are planned along the route. The entry shaft will have a diameter of 20m, while the other shafts will range from 9m to 13m.<\/p>\n<h5>Procurement and construction schedule<\/h5>\n<p>Tunnelling was not scheduled to begin before 2029. The withdrawal of the contract notice means VA SYD must clarify land-access arrangements and review its contracting strategy before proceeding with the tunnel procurement.<\/p>\n<p>MAXIMA has been under consideration since 2017 and represents a major regional investment in wastewater treatment capacity and infrastructure for southern Sweden.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swedish water and waste management company VA SYD has withdrawn the contract notice for the wastewater tunnels and shafts forming part of its MAXIMA wastewater treatment system, following a reassessment of project risks. The procurement notice was published in early June but has since been withdrawn after uncertainties emerged over access to land required for the construction of tunnel shafts. According to MAXIMA programme director Christer Hallgren, the risk was identified during preparations for the environmental permit application and the process of securing utility easements. VA SYD concluded that proceeding with the existing procurement strategy would expose the project to [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20952,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[5996,5995,5994,5131,284,5993,5786,5712],"class_list":["post-20951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-lund","tag-malmo","tag-maxima","tag-microtunnelling","tag-sweden","tag-va-syd","tag-wastewater-infrastructure","tag-wastewater-tunnel","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>VA SYD Withdraws MAXIMA Wastewater Tunnel Procurement<\/title>\n<meta name=\"description\" content=\"VA SYD has withdrawn procurement for Sweden&#039;s MAXIMA wastewater tunnels after a risk assessment identified uncertainties over land access for shafts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20951\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"VA SYD Withdraws MAXIMA Wastewater Tunnel Procurement\" \/>\n<meta property=\"og:description\" content=\"VA SYD has withdrawn procurement for Sweden&#039;s MAXIMA wastewater tunnels after a risk assessment identified uncertainties over land access for shafts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20951\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T13:34:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/IMage-1-4.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1076\" \/>\n\t<meta property=\"og:image:height\" content=\"581\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"VA SYD withdraws procurement for MAXIMA wastewater tunnels in Sweden\",\"datePublished\":\"2026-11-18T13:34:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951\"},\"wordCount\":476,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/IMage-1-4.png\",\"keywords\":[\"Lund\",\"Malm\u00f6\",\"MAXIMA\",\"Microtunnelling\",\"Sweden\",\"VA SYD\",\"wastewater infrastructure\",\"Wastewater Tunnel\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951\",\"name\":\"VA SYD Withdraws MAXIMA Wastewater Tunnel Procurement\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/IMage-1-4.png\",\"datePublished\":\"2026-11-18T13:34:28+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"VA SYD has withdrawn procurement for Sweden's MAXIMA wastewater tunnels after a risk assessment identified uncertainties over land access for shafts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/IMage-1-4.png\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/IMage-1-4.png\",\"width\":1076,\"height\":581,\"caption\":\"MAXIMA wastewater tunnels\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20951#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"VA SYD withdraws procurement for MAXIMA wastewater tunnels in Sweden\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"VA SYD Withdraws MAXIMA Wastewater Tunnel Procurement","description":"VA SYD has withdrawn procurement for Sweden's MAXIMA wastewater tunnels after a risk assessment identified uncertainties over land access for shafts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20951","og_locale":"en_US","og_type":"article","og_title":"VA SYD Withdraws MAXIMA Wastewater Tunnel Procurement","og_description":"VA SYD has withdrawn procurement for Sweden's MAXIMA wastewater tunnels after a risk assessment identified uncertainties over land access for shafts.","og_url":"https:\/\/tunnelingworld.com\/?p=20951","og_site_name":"Tunnelingworld","article_published_time":"2026-11-18T13:34:28+00:00","og_image":[{"width":1076,"height":581,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/IMage-1-4.png","type":"image\/png"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20951#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20951"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"VA SYD withdraws procurement for MAXIMA wastewater tunnels in Sweden","datePublished":"2026-11-18T13:34:28+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20951"},"wordCount":476,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20951#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/IMage-1-4.png","keywords":["Lund","Malm\u00f6","MAXIMA","Microtunnelling","Sweden","VA SYD","wastewater infrastructure","Wastewater Tunnel"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20951","url":"https:\/\/tunnelingworld.com\/?p=20951","name":"VA SYD Withdraws MAXIMA Wastewater Tunnel Procurement","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20951#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20951#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/IMage-1-4.png","datePublished":"2026-11-18T13:34:28+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"VA SYD has withdrawn procurement for Sweden's MAXIMA wastewater tunnels after a risk assessment identified uncertainties over land access for shafts.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20951#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20951"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20951#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/IMage-1-4.png","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/IMage-1-4.png","width":1076,"height":581,"caption":"MAXIMA wastewater tunnels"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20951#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"VA SYD withdraws procurement for MAXIMA wastewater tunnels in Sweden"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20951"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20951\/revisions"}],"predecessor-version":[{"id":20953,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20951\/revisions\/20953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20952"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}