{"id":20913,"date":"2026-11-10T05:06:53","date_gmt":"2026-11-10T05:06:53","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20913"},"modified":"2026-11-10T05:06:53","modified_gmt":"2026-11-10T05:06:53","slug":"ghella-herne-bay-collector-microtunnelling-auckland","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20913","title":{"rendered":"Ghella starts microtunnelling on Auckland\u2019s Herne Bay Collector"},"content":{"rendered":"<p>Ghella has commenced tunnelling on Watercare\u2019s Herne Bay Collector project in Auckland, New Zealand, with a micro tunnel boring machine (MTBM) named Domenica beginning excavation of the first of seven tunnel sections.<\/p>\n<p>The 1.7km-long, 2.1m-diameter wastewater tunnel is designed to reduce combined wastewater and stormwater overflows into the Waitemat\u0101 Harbour. It will connect Herne Bay\u2019s existing network to Auckland\u2019s Central Interceptor, which carries wastewater for treatment at the M\u0101ngere Wastewater Treatment Plant.<\/p>\n<p>The project includes seven main shafts, three intermediate shafts and a seven-storey underground control chamber within a 20m-deep shaft beneath Point Erin Park.<\/p>\n<p>The NZ$260m Herne Bay Collector forms part of Watercare\u2019s NZ$1.6bn Waitemat\u0101 Water Quality Improvement Programme, which builds on the benefits of the Central Interceptor. The wider programme is one of nine workstreams within Watercare\u2019s NZ$15.2bn, 10-year capital investment programme, comprising more than 1,000 projects.<\/p>\n<p>Once operational, the collector will capture wet-weather flows from Herne Bay\u2019s combined wastewater and stormwater network and divert them to the Central Interceptor. It will have the capacity to convey up to 6,000 litres per second of combined and wet-weather flows.<\/p>\n<p>Watercare chief infrastructure officer Mark Crowle said microtunnelling would help minimise disruption at the surface by allowing most construction work to take place underground from a series of shafts, rather than requiring a continuous trench through residential streets.<\/p>\n<p>Ghella New Zealand country director Rosario Barresi said Domenica is expected to complete its first 626m drive around the middle of next year.<\/p>\n<p>Barresi described the launch as an important milestone for the project team, highlighting the planning and precision required to deliver underground infrastructure in a constrained residential environment, with homes located close to construction sites.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ghella has commenced tunnelling on Watercare\u2019s Herne Bay Collector project in Auckland, New Zealand, with a micro tunnel boring machine (MTBM) named Domenica beginning excavation of the first of seven tunnel sections. The 1.7km-long, 2.1m-diameter wastewater tunnel is designed to reduce combined wastewater and stormwater overflows into the Waitemat\u0101 Harbour. It will connect Herne Bay\u2019s existing network to Auckland\u2019s Central Interceptor, which carries wastewater for treatment at the M\u0101ngere Wastewater Treatment Plant. The project includes seven main shafts, three intermediate shafts and a seven-storey underground control chamber within a 20m-deep shaft beneath Point Erin Park. The NZ$260m Herne Bay Collector [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20914,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[413,683,1645,5953,5131,486,415,5954,5712,2714],"class_list":["post-20913","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","tag-auckland","tag-central-interceptor","tag-ghella","tag-herne-bay-collector","tag-microtunnelling","tag-mtbm","tag-new-zealand","tag-waitemata-harbour","tag-wastewater-tunnel","tag-watercare","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ghella Starts Microtunnelling on Auckland\u2019s Herne Bay Collector<\/title>\n<meta name=\"description\" content=\"Ghella started tunnelling on Auckland\u2019s 1.7km HerneBay Collector, by MTBM Domenica to connect wastewater network to the Central Interceptor.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20913\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghella Starts Microtunnelling on Auckland\u2019s Herne Bay Collector\" \/>\n<meta property=\"og:description\" content=\"Ghella started tunnelling on Auckland\u2019s 1.7km HerneBay Collector, by MTBM Domenica to connect wastewater network to the Central Interceptor.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20913\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-10T05:06:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-1-5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"921\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Ghella starts microtunnelling on Auckland\u2019s Herne Bay Collector\",\"datePublished\":\"2026-11-10T05:06:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913\"},\"wordCount\":292,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-1-5.jpg\",\"keywords\":[\"Auckland\",\"Central Interceptor\",\"Ghella\",\"Herne Bay Collector\",\"Microtunnelling\",\"MTBM\",\"New Zealand\",\"Waitemat\u0101 Harbour\",\"Wastewater Tunnel\",\"Watercare\"],\"articleSection\":[\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913\",\"name\":\"Ghella Starts Microtunnelling on Auckland\u2019s Herne Bay Collector\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-1-5.jpg\",\"datePublished\":\"2026-11-10T05:06:53+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Ghella started tunnelling on Auckland\u2019s 1.7km HerneBay Collector, by MTBM Domenica to connect wastewater network to the Central Interceptor.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-1-5.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Image-1-5.jpg\",\"width\":921,\"height\":683,\"caption\":\"Herne Bay Collector tunnel\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20913#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ghella starts microtunnelling on Auckland\u2019s Herne Bay Collector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ghella Starts Microtunnelling on Auckland\u2019s Herne Bay Collector","description":"Ghella started tunnelling on Auckland\u2019s 1.7km HerneBay Collector, by MTBM Domenica to connect wastewater network to the Central Interceptor.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20913","og_locale":"en_US","og_type":"article","og_title":"Ghella Starts Microtunnelling on Auckland\u2019s Herne Bay Collector","og_description":"Ghella started tunnelling on Auckland\u2019s 1.7km HerneBay Collector, by MTBM Domenica to connect wastewater network to the Central Interceptor.","og_url":"https:\/\/tunnelingworld.com\/?p=20913","og_site_name":"Tunnelingworld","article_published_time":"2026-11-10T05:06:53+00:00","og_image":[{"width":921,"height":683,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-1-5.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20913#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20913"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Ghella starts microtunnelling on Auckland\u2019s Herne Bay Collector","datePublished":"2026-11-10T05:06:53+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20913"},"wordCount":292,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20913#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-1-5.jpg","keywords":["Auckland","Central Interceptor","Ghella","Herne Bay Collector","Microtunnelling","MTBM","New Zealand","Waitemat\u0101 Harbour","Wastewater Tunnel","Watercare"],"articleSection":["Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20913","url":"https:\/\/tunnelingworld.com\/?p=20913","name":"Ghella Starts Microtunnelling on Auckland\u2019s Herne Bay Collector","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20913#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20913#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-1-5.jpg","datePublished":"2026-11-10T05:06:53+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Ghella started tunnelling on Auckland\u2019s 1.7km HerneBay Collector, by MTBM Domenica to connect wastewater network to the Central Interceptor.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20913#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20913"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20913#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-1-5.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Image-1-5.jpg","width":921,"height":683,"caption":"Herne Bay Collector tunnel"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20913#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Ghella starts microtunnelling on Auckland\u2019s Herne Bay Collector"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20913"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20913\/revisions"}],"predecessor-version":[{"id":20915,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20913\/revisions\/20915"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20914"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}