{"id":20886,"date":"2026-11-06T14:23:07","date_gmt":"2026-11-06T14:23:07","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20886"},"modified":"2026-11-06T14:23:07","modified_gmt":"2026-11-06T14:23:07","slug":"rmtc-appointed-to-manage-riyadh-metro-red-line-extension","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20886","title":{"rendered":"RMTC appointed to manage Riyadh Metro Red Line extension"},"content":{"rendered":"<p data-pm-slice=\"1 1 []\">Riyadh Metro Transit Consultants (RMTC), a joint venture between Parsons Corporation, Systra and Egis, has been selected to provide project and construction management services for the Riyadh Metro Red Line Extension.<\/p>\n<p>Awarded in March 2026, the contract was recently announced by RMTC. The joint venture will provide management and supervision services on behalf of the Royal Commission for Riyadh City (RCRC), covering the design, implementation, commissioning and commencement of operations of the 8.4km extension.<\/p>\n<p>The driverless extension will connect the existing Red Line terminus at King Saud University with Diriyah South. Approximately 7.1km of the route will run underground, with the project comprising five stations: three underground and two elevated.<\/p>\n<p>RMTC has been involved in the Riyadh Metro programme since 2013. The joint venture has managed the delivery of three of the network\u2019s six lines \u2013 Blue, Red and Orange \u2013 representing more than 65% of the overall metro programme.<\/p>\n<p>\u201cWe are honoured to continue working on the Riyadh Metro, a transformative project that is redefining urban mobility in the Kingdom\u2019s capital and enhancing quality of life,\u201d said Pierre Santoni, president of Infrastructure EMEA at Parsons.<\/p>\n<p>\u201cAs a proud long-term partner of the RCRC, and the lead consultant for the delivery of this world-class system, we look forward to supporting the city of Riyadh and the Kingdom in successfully completing this extension and future phases of the metro, leveraging our global expertise and deep local knowledge to drive excellence at every stage of delivery.\u201d<\/p>\n<p>In January 2026, RCRC awarded the design-and-build contract for the Red Line Extension to a consortium led by Webuild, comprising Larsen &amp; Toubro, Nesma and Alstom. RMTC\u2019s appointment covers the separate project and construction management role.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Riyadh Metro Transit Consultants (RMTC), a joint venture between Parsons Corporation, Systra and Egis, has been selected to provide project and construction management services for the Riyadh Metro Red Line Extension. Awarded in March 2026, the contract was recently announced by RMTC. The joint venture will provide management and supervision services on behalf of the Royal Commission for Riyadh City (RCRC), covering the design, implementation, commissioning and commencement of operations of the 8.4km extension. The driverless extension will connect the existing Red Line terminus at King Saud University with Diriyah South. Approximately 7.1km of the route will run underground, with [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20887,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[5930,3349,5744,4962,5928,1402,5929,2112,4090,5931,783],"class_list":["post-20886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","tag-egis","tag-larsen-toubro","tag-metro-construction","tag-parsons","tag-red-line-extension","tag-riyadh-metro","tag-rmtc","tag-saudi-arabia","tag-systra","tag-underground-rail","tag-webuild","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>RMTC Appointed to Manage Riyadh Metro Red Line Extension<\/title>\n<meta name=\"description\" content=\"Riyadh appoints the Parsons, Systra and Egis joint venture RMTC to manage the 8.4km Red Line extension, incl 7.1km of underground alignment.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20886\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RMTC Appointed to Manage Riyadh Metro Red Line Extension\" \/>\n<meta property=\"og:description\" content=\"Riyadh appoints the Parsons, Systra and Egis joint venture RMTC to manage the 8.4km Red Line extension, incl 7.1km of underground alignment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20886\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-06T14:23:07+00:00\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"RMTC appointed to manage Riyadh Metro Red Line extension\",\"datePublished\":\"2026-11-06T14:23:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886\"},\"wordCount\":286,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Images-2.avif\",\"keywords\":[\"Egis\",\"Larsen &amp; Toubro\",\"metro construction\",\"Parsons\",\"Red Line Extension\",\"Riyadh Metro\",\"RMTC\",\"Saudi Arabia\",\"Systra\",\"underground rail\",\"Webuild\"],\"articleSection\":[\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886\",\"name\":\"RMTC Appointed to Manage Riyadh Metro Red Line Extension\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Images-2.avif\",\"datePublished\":\"2026-11-06T14:23:07+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Riyadh appoints the Parsons, Systra and Egis joint venture RMTC to manage the 8.4km Red Line extension, incl 7.1km of underground alignment.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Images-2.avif\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Images-2.avif\",\"width\":1017,\"height\":675,\"caption\":\"Riyadh Metro Red Line extension\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20886#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RMTC appointed to manage Riyadh Metro Red Line extension\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"RMTC Appointed to Manage Riyadh Metro Red Line Extension","description":"Riyadh appoints the Parsons, Systra and Egis joint venture RMTC to manage the 8.4km Red Line extension, incl 7.1km of underground alignment.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20886","og_locale":"en_US","og_type":"article","og_title":"RMTC Appointed to Manage Riyadh Metro Red Line Extension","og_description":"Riyadh appoints the Parsons, Systra and Egis joint venture RMTC to manage the 8.4km Red Line extension, incl 7.1km of underground alignment.","og_url":"https:\/\/tunnelingworld.com\/?p=20886","og_site_name":"Tunnelingworld","article_published_time":"2026-11-06T14:23:07+00:00","author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20886#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20886"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"RMTC appointed to manage Riyadh Metro Red Line extension","datePublished":"2026-11-06T14:23:07+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20886"},"wordCount":286,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20886#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Images-2.avif","keywords":["Egis","Larsen &amp; Toubro","metro construction","Parsons","Red Line Extension","Riyadh Metro","RMTC","Saudi Arabia","Systra","underground rail","Webuild"],"articleSection":["Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20886","url":"https:\/\/tunnelingworld.com\/?p=20886","name":"RMTC Appointed to Manage Riyadh Metro Red Line Extension","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20886#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20886#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Images-2.avif","datePublished":"2026-11-06T14:23:07+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Riyadh appoints the Parsons, Systra and Egis joint venture RMTC to manage the 8.4km Red Line extension, incl 7.1km of underground alignment.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20886#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20886"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20886#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Images-2.avif","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/11\/Images-2.avif","width":1017,"height":675,"caption":"Riyadh Metro Red Line extension"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20886#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"RMTC appointed to manage Riyadh Metro Red Line extension"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20886"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20886\/revisions"}],"predecessor-version":[{"id":20888,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20886\/revisions\/20888"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20887"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}