{"id":20800,"date":"2026-10-24T05:17:24","date_gmt":"2026-10-24T05:17:24","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20800"},"modified":"2026-10-24T05:24:42","modified_gmt":"2026-10-24T05:24:42","slug":"sydney-water-ryde-pymble-micro-tbm-launch","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20800","title":{"rendered":"Sydney Water Prepares to Launch mTBM for Ryde\u2013Pymble Pipeline Upgrade"},"content":{"rendered":"<p>The joint venture is assembling the machine ahead of its planned launch later in October. Piper will bore towards the Kissing Point Road receival shaft as part of the project to upgrade drinking water infrastructure on Sydney\u2019s North Shore.<\/p>\n<h5><strong>Direct Pipe Technology to Minimise Surface Impact<\/strong><\/h5>\n<p>The underground section will be constructed using Direct Pipe technology, which combines tunnel excavation with the installation of the new pipeline behind the tunnelling machine.<\/p>\n<p>The method will allow the project team to install the drinking water pipeline beneath the river and national park while minimising surface disruption in the environmentally sensitive area.<\/p>\n<p>The 1.3m-diameter mTBM will excavate the 680m alignment, providing a trenchless solution for the section where conventional open-cut construction would have a greater surface impact.<\/p>\n<p>The drive is scheduled for completion in early March 2027.<\/p>\n<h5><strong>Replacing Sydney\u2019s 1936 Water Pipeline<\/strong><\/h5>\n<p>The Ryde to Pymble Pipeline Upgrade is replacing the original water pipeline, which was built in 1936, to support the drinking water network serving Sydney\u2019s North Shore.<\/p>\n<p>McConnell Dowell and Gamuda Australia hold a <strong>A$157m (\u20ac98m) contract<\/strong> for the project. The works involve installing more than 10km of DN900 water main between the Ryde Pump Station and Wahroonga Reservoir.<\/p>\n<p>Construction combines open-trench installation with trenchless methods to deliver the new pipeline across different sections of the route.<\/p>\n<p>The project is intended to renew ageing water infrastructure while using trenchless construction in locations where minimising surface disturbance is particularly important.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The joint venture is assembling the machine ahead of its planned launch later in October. Piper will bore towards the Kissing Point Road receival shaft as part of the project to upgrade drinking water infrastructure on Sydney\u2019s North Shore. Direct Pipe Technology to Minimise Surface Impact The underground section will be constructed using Direct Pipe technology, which combines tunnel excavation with the installation of the new pipeline behind the tunnelling machine. The method will allow the project team to install the drinking water pipeline beneath the river and national park while minimising surface disruption in the environmentally sensitive area. The [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20801,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[215,5820,5822,5824,5821,5019,5819,5818,5817,5823,642],"class_list":["post-20800","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","tag-australia","tag-direct-pipe","tag-gamuda-australia","tag-lane-cove-national-park","tag-mcconnell-dowell","tag-micro-tbm","tag-mtbm-piper","tag-ryde-to-pymble-pipeline-upgrade","tag-sydney-water","tag-trenchless-technology","tag-water-pipeline","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sydney Water Prepares MTBM for Pymble Pipeline Upgrade<\/title>\n<meta name=\"description\" content=\"Sydney Water\u2019s Ryde\u2013Pymble pipeline upgrade will use a 1.3m mTBM and Pipe tech to install 680m of pipeline beneath a river &amp; national park.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20800\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sydney Water Prepares MTBM for Pymble Pipeline Upgrade\" \/>\n<meta property=\"og:description\" content=\"Sydney Water\u2019s Ryde\u2013Pymble pipeline upgrade will use a 1.3m mTBM and Pipe tech to install 680m of pipeline beneath a river &amp; national park.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20800\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T05:17:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T05:24:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-13.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"482\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Sydney Water Prepares to Launch mTBM for Ryde\u2013Pymble Pipeline Upgrade\",\"datePublished\":\"2026-10-24T05:17:24+00:00\",\"dateModified\":\"2026-10-24T05:24:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800\"},\"wordCount\":250,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-13.jpg\",\"keywords\":[\"Australia\",\"Direct Pipe\",\"Gamuda Australia\",\"Lane Cove National Park\",\"McConnell Dowell\",\"Micro TBM\",\"mTBM Piper\",\"Ryde to Pymble Pipeline Upgrade\",\"Sydney Water\",\"trenchless technology\",\"Water Pipeline\"],\"articleSection\":[\"Contract\\\/projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800\",\"name\":\"Sydney Water Prepares MTBM for Pymble Pipeline Upgrade\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-13.jpg\",\"datePublished\":\"2026-10-24T05:17:24+00:00\",\"dateModified\":\"2026-10-24T05:24:42+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Sydney Water\u2019s Ryde\u2013Pymble pipeline upgrade will use a 1.3m mTBM and Pipe tech to install 680m of pipeline beneath a river & national park.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-13.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-13.jpg\",\"width\":750,\"height\":482,\"caption\":\"Ryde to Pymble Pipeline Upgrade\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20800#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sydney Water Prepares to Launch mTBM for Ryde\u2013Pymble Pipeline Upgrade\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sydney Water Prepares MTBM for Pymble Pipeline Upgrade","description":"Sydney Water\u2019s Ryde\u2013Pymble pipeline upgrade will use a 1.3m mTBM and Pipe tech to install 680m of pipeline beneath a river & national park.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20800","og_locale":"en_US","og_type":"article","og_title":"Sydney Water Prepares MTBM for Pymble Pipeline Upgrade","og_description":"Sydney Water\u2019s Ryde\u2013Pymble pipeline upgrade will use a 1.3m mTBM and Pipe tech to install 680m of pipeline beneath a river & national park.","og_url":"https:\/\/tunnelingworld.com\/?p=20800","og_site_name":"Tunnelingworld","article_published_time":"2026-10-24T05:17:24+00:00","article_modified_time":"2026-10-24T05:24:42+00:00","og_image":[{"width":750,"height":482,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-13.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20800#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20800"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Sydney Water Prepares to Launch mTBM for Ryde\u2013Pymble Pipeline Upgrade","datePublished":"2026-10-24T05:17:24+00:00","dateModified":"2026-10-24T05:24:42+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20800"},"wordCount":250,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20800#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-13.jpg","keywords":["Australia","Direct Pipe","Gamuda Australia","Lane Cove National Park","McConnell Dowell","Micro TBM","mTBM Piper","Ryde to Pymble Pipeline Upgrade","Sydney Water","trenchless technology","Water Pipeline"],"articleSection":["Contract\/projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20800","url":"https:\/\/tunnelingworld.com\/?p=20800","name":"Sydney Water Prepares MTBM for Pymble Pipeline Upgrade","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20800#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20800#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-13.jpg","datePublished":"2026-10-24T05:17:24+00:00","dateModified":"2026-10-24T05:24:42+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Sydney Water\u2019s Ryde\u2013Pymble pipeline upgrade will use a 1.3m mTBM and Pipe tech to install 680m of pipeline beneath a river & national park.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20800#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20800"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20800#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-13.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-13.jpg","width":750,"height":482,"caption":"Ryde to Pymble Pipeline Upgrade"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20800#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Sydney Water Prepares to Launch mTBM for Ryde\u2013Pymble Pipeline Upgrade"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20800"}],"version-history":[{"count":3,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20800\/revisions"}],"predecessor-version":[{"id":20804,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20800\/revisions\/20804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20801"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}