{"id":20715,"date":"2026-10-13T11:20:21","date_gmt":"2026-10-13T11:20:21","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20715"},"modified":"2026-10-13T11:20:21","modified_gmt":"2026-10-13T11:20:21","slug":"construction-begins-on-germanys-11km-pfaffensteig-railway-tunnel","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20715","title":{"rendered":"Construction Begins on Germany\u2019s 11km Pfaffensteig Railway Tunnel"},"content":{"rendered":"<p>Construction has officially begun on Deutsche Bahn\u2019s Pfaffensteig Tunnel in Germany, marking a major step in the expansion of the G\u00e4ubahn railway line. The start of work was celebrated with an excavator making the ceremonial first cut.<\/p>\n<p>The approximately 11km-long tunnel will connect the long-distance railway station at Stuttgart Airport with the existing G\u00e4ubahn line, improving the railway connection to the Stuttgart region.<\/p>\n<h5><strong>TBMs to excavate 9.8km of the tunnel<\/strong><\/h5>\n<p>The project is divided into two project approval sections. The first covers the construction of the main tunnel, with approximately 9.8km to be excavated using two tunnel boring machines (TBMs).<\/p>\n<p>The connection beneath the A8 motorway and the new railway line, including the link to the underground long-distance railway station at Stuttgart Airport, will be constructed using conventional methods.<\/p>\n<p>The second section includes approximately 240m of tunnel to be built using the cut-and-cover method.<\/p>\n<h5><strong>Airport railway connection takes shape<\/strong><\/h5>\n<p>Preparatory work has already been completed at Stuttgart Airport\u2019s long-distance railway station. The connecting structure for the Pfaffensteig Tunnel has been constructed, and the switch connection and initial metres of track are also in place.<\/p>\n<p>These works form part of the wider railway infrastructure required to integrate the new tunnel with the existing network.<\/p>\n<h5><strong>Rail partnership delivers the project<\/strong><\/h5>\n<p>Deutsche Bahn is delivering the Pfaffensteig Tunnel through a rail partnership with Allianz G\u00e4ubahnausbau Nord. The consortium comprises STRABAG, Z\u00fcblin, Wayss &amp; Freytag, Rhomberg Bahntechnik, FCP (Fritsch, Chiari &amp; Partner ZT GmbH), Geoconsult, H\u00f6rmann, iC Consulenten, Spitzke and Swietelsky.<\/p>\n<p>The tunnel forms part of the broader expansion of the G\u00e4ubahn line, strengthening rail connectivity around Stuttgart and linking the airport\u2019s long-distance station with the existing railway corridor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction has officially begun on Deutsche Bahn\u2019s Pfaffensteig Tunnel in Germany, marking a major step in the expansion of the G\u00e4ubahn railway line. The start of work was celebrated with an excavator making the ceremonial first cut. The approximately 11km-long tunnel will connect the long-distance railway station at Stuttgart Airport with the existing G\u00e4ubahn line, improving the railway connection to the Stuttgart region. TBMs to excavate 9.8km of the tunnel The project is divided into two project approval sections. The first covers the construction of the main tunnel, with approximately 9.8km to be excavated using two tunnel boring machines (TBMs). [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20716,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[5710,207,5709],"class_list":["post-20715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","tag-gaubahn-railway-line","tag-germany","tag-pfaffensteig-railway-tunnel","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Begins on Germany\u2019s Pfaffensteig Tunnel<\/title>\n<meta name=\"description\" content=\"Construction begins on Germany\u2019s 11km Pfaffensteig Tunnel, with two TBMs set to excavate 9.8km to connect Stuttgart Airport.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20715\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Begins on Germany\u2019s Pfaffensteig Tunnel\" \/>\n<meta property=\"og:description\" content=\"Construction begins on Germany\u2019s 11km Pfaffensteig Tunnel, with two TBMs set to excavate 9.8km to connect Stuttgart Airport.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20715\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-13T11:20:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-7.png\" \/>\n\t<meta property=\"og:image:width\" content=\"619\" \/>\n\t<meta property=\"og:image:height\" content=\"410\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Construction Begins on Germany\u2019s 11km Pfaffensteig Railway Tunnel\",\"datePublished\":\"2026-10-13T11:20:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715\"},\"wordCount\":293,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-7.png\",\"keywords\":[\"G\u00e4ubahn railway line\",\"Germany\",\"Pfaffensteig Railway Tunnel\"],\"articleSection\":[\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715\",\"name\":\"Construction Begins on Germany\u2019s Pfaffensteig Tunnel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-7.png\",\"datePublished\":\"2026-10-13T11:20:21+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Construction begins on Germany\u2019s 11km Pfaffensteig Tunnel, with two TBMs set to excavate 9.8km to connect Stuttgart Airport.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-7.png\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-7.png\",\"width\":619,\"height\":410,\"caption\":\"Pfaffensteig Tunnel\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20715#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Begins on Germany\u2019s 11km Pfaffensteig Railway Tunnel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Begins on Germany\u2019s Pfaffensteig Tunnel","description":"Construction begins on Germany\u2019s 11km Pfaffensteig Tunnel, with two TBMs set to excavate 9.8km to connect Stuttgart Airport.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20715","og_locale":"en_US","og_type":"article","og_title":"Construction Begins on Germany\u2019s Pfaffensteig Tunnel","og_description":"Construction begins on Germany\u2019s 11km Pfaffensteig Tunnel, with two TBMs set to excavate 9.8km to connect Stuttgart Airport.","og_url":"https:\/\/tunnelingworld.com\/?p=20715","og_site_name":"Tunnelingworld","article_published_time":"2026-10-13T11:20:21+00:00","og_image":[{"width":619,"height":410,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-7.png","type":"image\/png"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20715#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20715"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Construction Begins on Germany\u2019s 11km Pfaffensteig Railway Tunnel","datePublished":"2026-10-13T11:20:21+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20715"},"wordCount":293,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20715#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-7.png","keywords":["G\u00e4ubahn railway line","Germany","Pfaffensteig Railway Tunnel"],"articleSection":["Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20715","url":"https:\/\/tunnelingworld.com\/?p=20715","name":"Construction Begins on Germany\u2019s Pfaffensteig Tunnel","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20715#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20715#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-7.png","datePublished":"2026-10-13T11:20:21+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Construction begins on Germany\u2019s 11km Pfaffensteig Tunnel, with two TBMs set to excavate 9.8km to connect Stuttgart Airport.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20715#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20715"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20715#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-7.png","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-7.png","width":619,"height":410,"caption":"Pfaffensteig Tunnel"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20715#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Construction Begins on Germany\u2019s 11km Pfaffensteig Railway Tunnel"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20715"}],"version-history":[{"count":2,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20715\/revisions"}],"predecessor-version":[{"id":20718,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20715\/revisions\/20718"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20716"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}