{"id":20615,"date":"2026-10-01T10:23:18","date_gmt":"2026-10-01T10:23:18","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20615"},"modified":"2026-10-01T10:23:18","modified_gmt":"2026-10-01T10:23:18","slug":"tunnelling-nears-halfway-point-on-bucharest-metro-line-6-section","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20615","title":{"rendered":"Tunnelling nears halfway point on Bucharest Metro Line 6 section"},"content":{"rendered":"<p class=\"w6asjq_TextBase _85PZeG_Text PDq2pG_selectionAnchorContainer\" data-d-component=\"text\">Tunnelling on the South Section of Bucharest Metro Line 6 is nearing the halfway point, with TERRATEC\u2019s refurbished 6.39m-diameter EPB TBM advancing beyond the future Gara B\u0103neasa station on the 6.6km twin-tunnel alignment.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">The section, extending from 1 Mai to Tokyo, is being delivered for metro operator Metrorex by the Alsim Alarko\u2013Makyol Joint Venture, which secured the contract in March 2022.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">Metro Line 6 will comprise 14.2km of twin tunnels and 12 new stations, connecting Gara de Nord in central Bucharest with Henri Coand\u0103 International Airport. The South Section includes six stations: 1 Mai, Pajura, Expozi\u021biei, B\u0103neasa, Washington and Tokyo.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">Since its launch in April 2025, the TBM has encountered varying ground conditions, including sand, clay, silt and gravel, as well as a shallow groundwater table and overburden of as little as 10m in some areas.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">A particularly challenging section took the machine beneath Her\u0103str\u0103u Lake, where it passed within 2.5m of an existing tunnel and close to the foundations of a bridge dating from the 1930s. Carefully controlled face pressure enabled the TBM to complete the crossing without disturbing either structure.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">TERRATEC field engineers have provided ongoing technical support, including a cutterhead inspection and tool change near the Tokyo station launch area. To accommodate changing ground conditions, the team replaced the disc cutters with rippers.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">The TBM\u2019s pre-project refurbishment, informed by its previous operating history, has also supported its performance along the constrained urban alignment.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">For the remaining drive, the joint venture is preparing for increased groundwater inflows. In coordination with TERRATEC, additional pressurised air has been introduced at the cutterhead to help control water ingress.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">As tunnelling approaches 1 Mai station, the TBM will pass within approximately 3.5m of the existing M4 tunnels. Ground improvement works are planned to manage the risks associated with this close-proximity crossing.<\/p>\n<p class=\"w6asjq_TextBase _85PZeG_Text\" data-d-component=\"text\">Civil works on the South Section are scheduled for completion in 2027, while the full Metro Line 6 route to Henri Coand\u0103 International Airport is targeted to open in 2028.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tunnelling on the South Section of Bucharest Metro Line 6 is nearing the halfway point, with TERRATEC\u2019s refurbished 6.39m-diameter EPB TBM advancing beyond the future Gara B\u0103neasa station on the 6.6km twin-tunnel alignment. The section, extending from 1 Mai to Tokyo, is being delivered for metro operator Metrorex by the Alsim Alarko\u2013Makyol Joint Venture, which secured the contract in March 2022. Metro Line 6 will comprise 14.2km of twin tunnels and 12 new stations, connecting Gara de Nord in central Bucharest with Henri Coand\u0103 International Airport. The South Section includes six stations: 1 Mai, Pajura, Expozi\u021biei, B\u0103neasa, Washington and Tokyo. [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20616,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[5614,58],"class_list":["post-20615","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","tag-bucharest-metro-line-6-section","tag-terratec","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bucharest Metro Line 6 Tunnelling Nears Halfway Point<\/title>\n<meta name=\"description\" content=\"TERRATEC\u2019s refurbished EPB TBM has reached the halfway point of the 6.6km Bucharest Metro Line 6 South Section tunnel drive.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20615\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bucharest Metro Line 6 Tunnelling Nears Halfway Point\" \/>\n<meta property=\"og:description\" content=\"TERRATEC\u2019s refurbished EPB TBM has reached the halfway point of the 6.6km Bucharest Metro Line 6 South Section tunnel drive.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20615\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-01T10:23:18+00:00\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Tunnelling nears halfway point on Bucharest Metro Line 6 section\",\"datePublished\":\"2026-10-01T10:23:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615\"},\"wordCount\":335,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-1.avif\",\"keywords\":[\"Bucharest Metro Line 6 section\",\"TERRATEC\"],\"articleSection\":[\"Contract\\\/projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615\",\"name\":\"Bucharest Metro Line 6 Tunnelling Nears Halfway Point\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-1.avif\",\"datePublished\":\"2026-10-01T10:23:18+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"TERRATEC\u2019s refurbished EPB TBM has reached the halfway point of the 6.6km Bucharest Metro Line 6 South Section tunnel drive.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-1.avif\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Image-1-1.avif\",\"width\":748,\"height\":433,\"caption\":\"Bucharest Metro Line 6 tunnelling\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20615#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tunnelling nears halfway point on Bucharest Metro Line 6 section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bucharest Metro Line 6 Tunnelling Nears Halfway Point","description":"TERRATEC\u2019s refurbished EPB TBM has reached the halfway point of the 6.6km Bucharest Metro Line 6 South Section tunnel drive.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20615","og_locale":"en_US","og_type":"article","og_title":"Bucharest Metro Line 6 Tunnelling Nears Halfway Point","og_description":"TERRATEC\u2019s refurbished EPB TBM has reached the halfway point of the 6.6km Bucharest Metro Line 6 South Section tunnel drive.","og_url":"https:\/\/tunnelingworld.com\/?p=20615","og_site_name":"Tunnelingworld","article_published_time":"2026-10-01T10:23:18+00:00","author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20615#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20615"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Tunnelling nears halfway point on Bucharest Metro Line 6 section","datePublished":"2026-10-01T10:23:18+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20615"},"wordCount":335,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20615#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-1.avif","keywords":["Bucharest Metro Line 6 section","TERRATEC"],"articleSection":["Contract\/projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20615","url":"https:\/\/tunnelingworld.com\/?p=20615","name":"Bucharest Metro Line 6 Tunnelling Nears Halfway Point","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20615#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20615#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-1.avif","datePublished":"2026-10-01T10:23:18+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"TERRATEC\u2019s refurbished EPB TBM has reached the halfway point of the 6.6km Bucharest Metro Line 6 South Section tunnel drive.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20615#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20615"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20615#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-1.avif","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/10\/Image-1-1.avif","width":748,"height":433,"caption":"Bucharest Metro Line 6 tunnelling"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20615#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Tunnelling nears halfway point on Bucharest Metro Line 6 section"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20615"}],"version-history":[{"count":2,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20615\/revisions"}],"predecessor-version":[{"id":20618,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20615\/revisions\/20618"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20616"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}