{"id":20600,"date":"2026-09-30T09:29:52","date_gmt":"2026-09-30T09:29:52","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20600"},"modified":"2026-09-30T09:29:52","modified_gmt":"2026-09-30T09:29:52","slug":"terratec-tbm-reaches-halfway-point-on-bucharest-line-6","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20600","title":{"rendered":"TERRATEC TBM reaches halfway point on Bucharest Line 6"},"content":{"rendered":"<p>The 6.39m-diameter machine has passed the future Gara B\u0103neasa station as it progresses on the 6.6km twin-tunnel section between 1 Mai and Tokyo.<\/p>\n<p>The southern section is being delivered for Metrorex by the Alsim Alarko\u2013Makyol JV, which was awarded the contract in March 2022. It includes six stations at 1 Mai, Pajura, Expozi\u021biei, B\u0103neasa, Washington and Tokyo.Line 6 will eventually comprise 14.2km of twin tunnels and 12 new stations, extending from Gara de Nord to Henri Coand\u0103 International Airport.<\/p>\n<p>Since launching in April 2025, the TERRATEC machine has encountered mixed sand, clay, silt and gravel, together with a shallow groundwater table and overburden reducing to around 10m in places.<\/p>\n<p>One of the more challenging sections took the TBM beneath Her\u0103str\u0103u Lake, passing within 2.5m of an adjacent tunnel and close to the foundations of a bridge dating from the 1930s. Face pressure was closely controlled during the crossing to minimise ground movement.<\/p>\n<p>TERRATEC field engineers have supported the TBM during the drive, including a cutterhead inspection and tool change. Disc cutters were replaced with rippers to accommodate changing ground conditions.<\/p>\n<p>The JV is preparing for increased groundwater flows during the remaining tunnelling, with additional pressurised air introduced at the cutterhead to help control water ingress.Towards the end of the drive, the TBM will pass within approximately 3.5m of the existing M4 tunnels as it approaches 1 Mai station, with ground improvement planned for the close-proximity crossing.<\/p>\n<p>Civil works on the southern section are scheduled for completion in 2027, while the complete Line 6 route to Henri Coand\u0103 International Airport is targeted to open in 2028.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 6.39m-diameter machine has passed the future Gara B\u0103neasa station as it progresses on the 6.6km twin-tunnel section between 1 Mai and Tokyo. The southern section is being delivered for Metrorex by the Alsim Alarko\u2013Makyol JV, which was awarded the contract in March 2022. It includes six stations at 1 Mai, Pajura, Expozi\u021biei, B\u0103neasa, Washington and Tokyo.Line 6 will eventually comprise 14.2km of twin tunnels and 12 new stations, extending from Gara de Nord to Henri Coand\u0103 International Airport. Since launching in April 2025, the TERRATEC machine has encountered mixed sand, clay, silt and gravel, together with a shallow groundwater [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20601,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[5610,662],"class_list":["post-20600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bucharest-metro-line-6-tbm","tag-terratec-tbm","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TERRATEC TBM Reaches Halfway on Bucharest Metro Line 6<\/title>\n<meta name=\"description\" content=\"A refurbished TERRATEC TBM has reached the halfway point of the 6.6km southern section of Bucharest Metro Line 6, advancing towards Tokyo station.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20600\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TERRATEC TBM Reaches Halfway on Bucharest Metro Line 6\" \/>\n<meta property=\"og:description\" content=\"A refurbished TERRATEC TBM has reached the halfway point of the 6.6km southern section of Bucharest Metro Line 6, advancing towards Tokyo station.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20600\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-30T09:29:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-10.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"TERRATEC TBM reaches halfway point on Bucharest Line 6\",\"datePublished\":\"2026-09-30T09:29:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600\"},\"wordCount\":271,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-10.jpg\",\"keywords\":[\"Bucharest Metro Line 6 TBM\",\"TERRATEC TBM\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600\",\"name\":\"TERRATEC TBM Reaches Halfway on Bucharest Metro Line 6\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-10.jpg\",\"datePublished\":\"2026-09-30T09:29:52+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"A refurbished TERRATEC TBM has reached the halfway point of the 6.6km southern section of Bucharest Metro Line 6, advancing towards Tokyo station.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-10.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-10.jpg\",\"width\":900,\"height\":600,\"caption\":\"Bucharest Metro Line 6 TBM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20600#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TERRATEC TBM reaches halfway point on Bucharest Line 6\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TERRATEC TBM Reaches Halfway on Bucharest Metro Line 6","description":"A refurbished TERRATEC TBM has reached the halfway point of the 6.6km southern section of Bucharest Metro Line 6, advancing towards Tokyo station.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20600","og_locale":"en_US","og_type":"article","og_title":"TERRATEC TBM Reaches Halfway on Bucharest Metro Line 6","og_description":"A refurbished TERRATEC TBM has reached the halfway point of the 6.6km southern section of Bucharest Metro Line 6, advancing towards Tokyo station.","og_url":"https:\/\/tunnelingworld.com\/?p=20600","og_site_name":"Tunnelingworld","article_published_time":"2026-09-30T09:29:52+00:00","og_image":[{"width":900,"height":600,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-10.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20600#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20600"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"TERRATEC TBM reaches halfway point on Bucharest Line 6","datePublished":"2026-09-30T09:29:52+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20600"},"wordCount":271,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20600#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-10.jpg","keywords":["Bucharest Metro Line 6 TBM","TERRATEC TBM"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20600","url":"https:\/\/tunnelingworld.com\/?p=20600","name":"TERRATEC TBM Reaches Halfway on Bucharest Metro Line 6","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20600#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20600#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-10.jpg","datePublished":"2026-09-30T09:29:52+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"A refurbished TERRATEC TBM has reached the halfway point of the 6.6km southern section of Bucharest Metro Line 6, advancing towards Tokyo station.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20600#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20600"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20600#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-10.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-10.jpg","width":900,"height":600,"caption":"Bucharest Metro Line 6 TBM"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20600#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"TERRATEC TBM reaches halfway point on Bucharest Line 6"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20600"}],"version-history":[{"count":3,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20600\/revisions"}],"predecessor-version":[{"id":20604,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20600\/revisions\/20604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20601"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}