{"id":20588,"date":"2026-09-29T09:10:52","date_gmt":"2026-09-29T09:10:52","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20588"},"modified":"2026-09-29T09:10:52","modified_gmt":"2026-09-29T09:10:52","slug":"dmrc-tenders-central-vista-tbm-package","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20588","title":{"rendered":"DMRC tenders Central Vista TBM package"},"content":{"rendered":"<p>Package EC-04 covers the design and construction of twin running tunnels using shield TBMs, together with four underground stations, connecting subways and associated entrances and exits.<\/p>\n<p>The open works tender was published on 25 September under Delhi Metro Phase V(A). Bids are due by 9 November 2026, with technical bids scheduled to open the following day. A pre-bid meeting is set for 7 October. The works are expected to take 1,260 days to complete.<\/p>\n<p>The Central Vista Corridor is being developed as an extension of Delhi Metro\u2019s Magenta Line and will run for 9.913km entirely underground, serving nine stations: Shivaji Stadium, Yuge Yugeen Bharat, Central Secretariat, Kartavya Bhawan, India Gate, War Memorial\u2013High Court, Baroda House, Bharat Mandapam and Indraprastha.<\/p>\n<p>Construction on the corridor has already started at Central Secretariat Station, which will become a three-line interchange connecting the new corridor with the existing Yellow and Violet lines.<\/p>\n<p>DMRC said the route will improve access to central government offices, judicial institutions, national monuments and major convention facilities in the heart of New Delhi.<\/p>\n<p>The procurement notice does not identify which four stations are included in EC-04 and does not state the tunnel length within the package.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Package EC-04 covers the design and construction of twin running tunnels using shield TBMs, together with four underground stations, connecting subways and associated entrances and exits. The open works tender was published on 25 September under Delhi Metro Phase V(A). Bids are due by 9 November 2026, with technical bids scheduled to open the following day. A pre-bid meeting is set for 7 October. The works are expected to take 1,260 days to complete. The Central Vista Corridor is being developed as an extension of Delhi Metro\u2019s Magenta Line and will run for 9.913km entirely underground, serving nine stations: Shivaji [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20589,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[5607,325],"class_list":["post-20588","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-show-case","tag-central-vista-tbm-package","tag-dmrc","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>DMRC Tenders Central Vista TBM Tunnel and Station Package<\/title>\n<meta name=\"description\" content=\"DMRC has invited bids for the Central Vista TBM package, covering twin shield-TBM tunnels and four underground stations on Delhi Metro Phase.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20588\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DMRC Tenders Central Vista TBM Tunnel and Station Package\" \/>\n<meta property=\"og:description\" content=\"DMRC has invited bids for the Central Vista TBM package, covering twin shield-TBM tunnels and four underground stations on Delhi Metro Phase.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20588\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-29T09:10:52+00:00\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"DMRC tenders Central Vista TBM package\",\"datePublished\":\"2026-09-29T09:10:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588\"},\"wordCount\":199,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-24.avif\",\"keywords\":[\"Central Vista TBM package\",\"DMRC\"],\"articleSection\":[\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588\",\"name\":\"DMRC Tenders Central Vista TBM Tunnel and Station Package\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-24.avif\",\"datePublished\":\"2026-09-29T09:10:52+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"DMRC has invited bids for the Central Vista TBM package, covering twin shield-TBM tunnels and four underground stations on Delhi Metro Phase.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-24.avif\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-1-24.avif\",\"width\":610,\"height\":407,\"caption\":\"Central Vista TBM package\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20588#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DMRC tenders Central Vista TBM package\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"DMRC Tenders Central Vista TBM Tunnel and Station Package","description":"DMRC has invited bids for the Central Vista TBM package, covering twin shield-TBM tunnels and four underground stations on Delhi Metro Phase.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20588","og_locale":"en_US","og_type":"article","og_title":"DMRC Tenders Central Vista TBM Tunnel and Station Package","og_description":"DMRC has invited bids for the Central Vista TBM package, covering twin shield-TBM tunnels and four underground stations on Delhi Metro Phase.","og_url":"https:\/\/tunnelingworld.com\/?p=20588","og_site_name":"Tunnelingworld","article_published_time":"2026-09-29T09:10:52+00:00","author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20588#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20588"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"DMRC tenders Central Vista TBM package","datePublished":"2026-09-29T09:10:52+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20588"},"wordCount":199,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20588#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-24.avif","keywords":["Central Vista TBM package","DMRC"],"articleSection":["Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20588","url":"https:\/\/tunnelingworld.com\/?p=20588","name":"DMRC Tenders Central Vista TBM Tunnel and Station Package","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20588#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20588#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-24.avif","datePublished":"2026-09-29T09:10:52+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"DMRC has invited bids for the Central Vista TBM package, covering twin shield-TBM tunnels and four underground stations on Delhi Metro Phase.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20588#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20588"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20588#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-24.avif","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/09\/Image-1-24.avif","width":610,"height":407,"caption":"Central Vista TBM package"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20588#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"DMRC tenders Central Vista TBM package"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20588"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20588\/revisions"}],"predecessor-version":[{"id":20590,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20588\/revisions\/20590"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20589"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}