{"id":20233,"date":"2026-08-15T07:18:01","date_gmt":"2026-08-15T07:18:01","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20233"},"modified":"2026-08-15T07:18:01","modified_gmt":"2026-08-15T07:18:01","slug":"podleze-gdow-railway-line-enters-a-key-construction-phase","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20233","title":{"rendered":"Pod\u0142\u0119\u017ce-Gd\u00f3w railway line enters a key construction phase"},"content":{"rendered":"<p>Budimex has reached the first four milestones on the construction of a new railway line in Poland.<\/p>\n<p>The company has begun engineering works on railway line No. 622 on the Pod\u0142\u0119\u017ce\u2013Gd\u00f3w section and the railway link No. 627 Pod\u0142\u0119\u017ce\u2013Pod\u0142\u0119\u017ce Balach\u00f3wka.<\/p>\n<p>Preparatory works are under way for the 900m-long T11 railway tunnel \u2013 one of the key elements of the Pod\u0142\u0119\u017ce-Gd\u00f3w line \u2013 as well as two 1.4km-long railway bridges, a 600m bridge and a 600m-long viaduct.<\/p>\n<p>Budimex contract directorAdrian Jasi\u00f3wkasaid the project had entered a key implementation phase phase.<\/p>\n<p>\u201cThe commencement of the construction of the most important engineering structures required professional preparations, project co-ordination and the mobilisation of significant technical resources. This is one of the most demanding railway investments currently being implemented in Poland, which will use advanced execution technologies, including tunnel drilling using the TBM method and the construction of large-scale bridge structures,\u201d he said.<\/p>\n<p>The PLN2.57bn (\u20ac600m) contract is one of the largest railway contracts Budimex is currently undertaking.<\/p>\n<p>It includes the design of SRK equipment and the construction of approximately 19km of double-track railway line No 622 and single-track railway link No 627 along with their integration into the existing railway lines No 91 and No 95. There will be two new railway stations at Pod\u0142\u0119\u017ce Balach\u00f3wka and Gd\u00f3w and passenger stops at Wiatowice and Zag\u00f3rze.<\/p>\n<p>As well as the T11 tunnel, Budimex will build 17 bridges and 11 railway viaducts, and five road viaducts.<\/p>\n<p>Construction is scheduled to be completed in 2029.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Budimex has reached the first four milestones on the construction of a new railway line in Poland. The company has begun engineering works on railway line No. 622 on the Pod\u0142\u0119\u017ce\u2013Gd\u00f3w section and the railway link No. 627 Pod\u0142\u0119\u017ce\u2013Pod\u0142\u0119\u017ce Balach\u00f3wka. Preparatory works are under way for the 900m-long T11 railway tunnel \u2013 one of the key elements of the Pod\u0142\u0119\u017ce-Gd\u00f3w line \u2013 as well as two 1.4km-long railway bridges, a 600m bridge and a 600m-long viaduct. Budimex contract directorAdrian Jasi\u00f3wkasaid the project had entered a key implementation phase phase. \u201cThe commencement of the construction of the most important engineering structures [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20234,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[4735,5421,68],"class_list":["post-20233","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-budimex","tag-railway-viaducts","tag-tunnel","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Budimex Reaches Key Milestones on Poland\u2019s Pod\u0142\u0119\u017ce-Gd\u00f3w Railway<\/title>\n<meta name=\"description\" content=\"Budimex reaches four key milestones on Poland\u2019s PLN2.57bn Pod\u0142\u0119\u017ce-Gd\u00f3w railway project, including preparations for a 900m TBM tunnel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20233\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Budimex Reaches Key Milestones on Poland\u2019s Pod\u0142\u0119\u017ce-Gd\u00f3w Railway\" \/>\n<meta property=\"og:description\" content=\"Budimex reaches four key milestones on Poland\u2019s PLN2.57bn Pod\u0142\u0119\u017ce-Gd\u00f3w railway project, including preparations for a 900m TBM tunnel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20233\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-15T07:18:01+00:00\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Pod\u0142\u0119\u017ce-Gd\u00f3w railway line enters a key construction phase\",\"datePublished\":\"2026-08-15T07:18:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233\"},\"wordCount\":262,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/poland-749x433-1.avif\",\"keywords\":[\"Budimex\",\"railway viaducts\",\"Tunnel\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233\",\"name\":\"Budimex Reaches Key Milestones on Poland\u2019s Pod\u0142\u0119\u017ce-Gd\u00f3w Railway\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/poland-749x433-1.avif\",\"datePublished\":\"2026-08-15T07:18:01+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Budimex reaches four key milestones on Poland\u2019s PLN2.57bn Pod\u0142\u0119\u017ce-Gd\u00f3w railway project, including preparations for a 900m TBM tunnel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/poland-749x433-1.avif\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/poland-749x433-1.avif\",\"width\":749,\"height\":433,\"caption\":\"Budimex Pod\u0142\u0119\u017ce-Gd\u00f3w railway project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20233#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pod\u0142\u0119\u017ce-Gd\u00f3w railway line enters a key construction phase\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Budimex Reaches Key Milestones on Poland\u2019s Pod\u0142\u0119\u017ce-Gd\u00f3w Railway","description":"Budimex reaches four key milestones on Poland\u2019s PLN2.57bn Pod\u0142\u0119\u017ce-Gd\u00f3w railway project, including preparations for a 900m TBM tunnel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20233","og_locale":"en_US","og_type":"article","og_title":"Budimex Reaches Key Milestones on Poland\u2019s Pod\u0142\u0119\u017ce-Gd\u00f3w Railway","og_description":"Budimex reaches four key milestones on Poland\u2019s PLN2.57bn Pod\u0142\u0119\u017ce-Gd\u00f3w railway project, including preparations for a 900m TBM tunnel.","og_url":"https:\/\/tunnelingworld.com\/?p=20233","og_site_name":"Tunnelingworld","article_published_time":"2026-08-15T07:18:01+00:00","author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20233#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20233"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Pod\u0142\u0119\u017ce-Gd\u00f3w railway line enters a key construction phase","datePublished":"2026-08-15T07:18:01+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20233"},"wordCount":262,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20233#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/poland-749x433-1.avif","keywords":["Budimex","railway viaducts","Tunnel"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20233","url":"https:\/\/tunnelingworld.com\/?p=20233","name":"Budimex Reaches Key Milestones on Poland\u2019s Pod\u0142\u0119\u017ce-Gd\u00f3w Railway","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20233#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20233#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/poland-749x433-1.avif","datePublished":"2026-08-15T07:18:01+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Budimex reaches four key milestones on Poland\u2019s PLN2.57bn Pod\u0142\u0119\u017ce-Gd\u00f3w railway project, including preparations for a 900m TBM tunnel.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20233#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20233"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20233#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/poland-749x433-1.avif","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/poland-749x433-1.avif","width":749,"height":433,"caption":"Budimex Pod\u0142\u0119\u017ce-Gd\u00f3w railway project"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20233#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Pod\u0142\u0119\u017ce-Gd\u00f3w railway line enters a key construction phase"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20233"}],"version-history":[{"count":2,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20233\/revisions"}],"predecessor-version":[{"id":20236,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20233\/revisions\/20236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20234"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20233"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20233"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}