{"id":20201,"date":"2026-08-08T05:20:37","date_gmt":"2026-08-08T05:20:37","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20201"},"modified":"2026-08-08T05:20:37","modified_gmt":"2026-08-08T05:20:37","slug":"creg-launches-13-23m-tbm-on-shenzhen-jiangmen-railway","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20201","title":{"rendered":"CREG launches 13.23m TBM on Shenzhen-Jiangmen Railway"},"content":{"rendered":"<p>The Shenguan No. 6 was launched on 5 August from Working Shaft No. 5 on Lot 6 of the project in Bao\u2019an District, Shenzhen, marking the start of full-scale mechanised tunnelling on the contract.<\/p>\n<p>The machine will excavate the 8,026.3m section between shafts No. 5 and No. 6, forming a single-bore, double-track tunnel.<\/p>\n<p>At 13.23m excavation diameter, the CREG-built single-shield TBM is approximately 160m long and weighs around 3,600 tonnes.<\/p>\n<p>The drive presents a number of technical challenges, with the alignment passing through mixed ground comprising alternating hard and soft strata, as well as hard rock with locally developed fissure water.<\/p>\n<p>The tunnel will also pass beneath the Shenzhen Metro lines 11 and 20 and the Sui-Guan-Shen Intercity Railway. Other sensitive crossings include under the Fuyong River, additional waterways and densely developed areas containing numerous existing buildings and structures.<\/p>\n<p>According to CREG, the TBM was developed specifically for the geological and operational constraints of the project and incorporates technologies intended to support automated and intelligent control during the long-distance excavation.<\/p>\n<p>The 116km Shenzhen-Jiangmen Railway will connect Shenzhen, Dongguan, Guangzhou, Zhongshan and Jiangmen and forms part of the coastal corridor of China\u2019s national high-speed railway network.<\/p>\n<p>Once operational, the railway is expected to reduce high-speed rail journey times between Shenzhen and Jiangmen to less than one hour.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Shenguan No. 6 was launched on 5 August from Working Shaft No. 5 on Lot 6 of the project in Bao\u2019an District, Shenzhen, marking the start of full-scale mechanised tunnelling on the contract. The machine will excavate the 8,026.3m section between shafts No. 5 and No. 6, forming a single-bore, double-track tunnel. At 13.23m excavation diameter, the CREG-built single-shield TBM is approximately 160m long and weighs around 3,600 tonnes. The drive presents a number of technical challenges, with the alignment passing through mixed ground comprising alternating hard and soft strata, as well as hard rock with locally developed fissure [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20202,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[1741,5409],"class_list":["post-20201","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-creg","tag-shenzhen-jiangmen-railway","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shenguan No. 6 TBM Begins 8km Tunnel Drive in Shenzhen<\/title>\n<meta name=\"description\" content=\"Shenguan No. 6 TBM begins an 8,026m tunnel drive in Shenzhen, navigating mixed ground, hard rock and complex crossings.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20201\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shenguan No. 6 TBM Begins 8km Tunnel Drive in Shenzhen\" \/>\n<meta property=\"og:description\" content=\"Shenguan No. 6 TBM begins an 8,026m tunnel drive in Shenzhen, navigating mixed ground, hard rock and complex crossings.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20201\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-08T05:20:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Image_20260807104850_209_10-768x576-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"CREG launches 13.23m TBM on Shenzhen-Jiangmen Railway\",\"datePublished\":\"2026-08-08T05:20:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201\"},\"wordCount\":216,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Image_20260807104850_209_10-768x576-1.jpg\",\"keywords\":[\"CREG\",\"Shenzhen-Jiangmen Railway\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201\",\"name\":\"Shenguan No. 6 TBM Begins 8km Tunnel Drive in Shenzhen\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Image_20260807104850_209_10-768x576-1.jpg\",\"datePublished\":\"2026-08-08T05:20:37+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Shenguan No. 6 TBM begins an 8,026m tunnel drive in Shenzhen, navigating mixed ground, hard rock and complex crossings.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Image_20260807104850_209_10-768x576-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Image_20260807104850_209_10-768x576-1.jpg\",\"width\":768,\"height\":576,\"caption\":\"Shenguan No. 6 TBM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20201#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CREG launches 13.23m TBM on Shenzhen-Jiangmen Railway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shenguan No. 6 TBM Begins 8km Tunnel Drive in Shenzhen","description":"Shenguan No. 6 TBM begins an 8,026m tunnel drive in Shenzhen, navigating mixed ground, hard rock and complex crossings.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20201","og_locale":"en_US","og_type":"article","og_title":"Shenguan No. 6 TBM Begins 8km Tunnel Drive in Shenzhen","og_description":"Shenguan No. 6 TBM begins an 8,026m tunnel drive in Shenzhen, navigating mixed ground, hard rock and complex crossings.","og_url":"https:\/\/tunnelingworld.com\/?p=20201","og_site_name":"Tunnelingworld","article_published_time":"2026-08-08T05:20:37+00:00","og_image":[{"width":768,"height":576,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Image_20260807104850_209_10-768x576-1.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20201#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20201"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"CREG launches 13.23m TBM on Shenzhen-Jiangmen Railway","datePublished":"2026-08-08T05:20:37+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20201"},"wordCount":216,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20201#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Image_20260807104850_209_10-768x576-1.jpg","keywords":["CREG","Shenzhen-Jiangmen Railway"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20201","url":"https:\/\/tunnelingworld.com\/?p=20201","name":"Shenguan No. 6 TBM Begins 8km Tunnel Drive in Shenzhen","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20201#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20201#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Image_20260807104850_209_10-768x576-1.jpg","datePublished":"2026-08-08T05:20:37+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Shenguan No. 6 TBM begins an 8,026m tunnel drive in Shenzhen, navigating mixed ground, hard rock and complex crossings.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20201#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20201"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20201#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Image_20260807104850_209_10-768x576-1.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Image_20260807104850_209_10-768x576-1.jpg","width":768,"height":576,"caption":"Shenguan No. 6 TBM"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20201#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"CREG launches 13.23m TBM on Shenzhen-Jiangmen Railway"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20201"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20201\/revisions"}],"predecessor-version":[{"id":20203,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20201\/revisions\/20203"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20202"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}