{"id":20191,"date":"2026-08-01T07:51:46","date_gmt":"2026-08-01T07:51:46","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20191"},"modified":"2026-08-01T07:51:46","modified_gmt":"2026-08-01T07:51:46","slug":"terratec-tbm-makes-first-breakthrough-on-delhi-metro-phase-iv-silver-line","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20191","title":{"rendered":"Terratec TBM makes first breakthrough on Delhi Metro Phase IV Silver Line"},"content":{"rendered":"<p><a href=\"https:\/\/www.jkumar.com\/\">JKumar Infraprojects<\/a> has achieved the first breakthrough on the Delhi Metro Phase IV Silver Line.<\/p>\n<p>The Terratec EPB TBM, named Narayani, completed its first drive after excavating a 1.6km-long tunnel on the Vasant Kunj to Mahipalpur section of the Aerocity\u2013Tughlakabad corridor of the Delhi Metro Rail Corporation project.<\/p>\n<p>As it advanced, the 6.61m-diameter machine installed 1,400mm-wide universal reinforced concrete lining rings, each comprising five segments plus a key. Muck removal and segment supply were managed by rail-bound, battery-powered equipment to minimize the environmental impact.<\/p>\n<p>The drive presented some of the most demanding ground conditions on the entire Phase-IV programme. The alignment runs through extremely hard rock, with uniaxial compressive strengths exceeding 200 MPa in places \u2013 conditions more typically associated with hard-rock mining than urban metro tunnelling.<\/p>\n<p>TBM Narayani\u2019s mixed-face cutterhead and hard-rock cutting tools were configured specifically for this challenging geology.<\/p>\n<p>Once complete, the Aerocity\u2013Tughlakabad corridor will improve connectivity across southern Delhi, linking the airport district with key residential and commercial centres and integrating with the wider Phase-IV network.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JKumar Infraprojects has achieved the first breakthrough on the Delhi Metro Phase IV Silver Line. The Terratec EPB TBM, named Narayani, completed its first drive after excavating a 1.6km-long tunnel on the Vasant Kunj to Mahipalpur section of the Aerocity\u2013Tughlakabad corridor of the Delhi Metro Rail Corporation project. As it advanced, the 6.61m-diameter machine installed 1,400mm-wide universal reinforced concrete lining rings, each comprising five segments plus a key. Muck removal and segment supply were managed by rail-bound, battery-powered equipment to minimize the environmental impact. The drive presented some of the most demanding ground conditions on the entire Phase-IV programme. The [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":20192,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[324,5406,58],"class_list":["post-20191","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-delhi-metro","tag-jkumar","tag-terratec","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Delhi Metro Phase IV Silver Line Records First TBM Breakthrough<\/title>\n<meta name=\"description\" content=\"JKumar Infraprojects achieved the first TBM breakthrough on Delhi Metro Phase IV&#039;s Silver Line breakthrough.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20191\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Delhi Metro Phase IV Silver Line Records First TBM Breakthrough\" \/>\n<meta property=\"og:description\" content=\"JKumar Infraprojects achieved the first TBM breakthrough on Delhi Metro Phase IV&#039;s Silver Line breakthrough.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20191\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-01T07:51:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Terratec-Delhi-700x467-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"467\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Terratec TBM makes first breakthrough on Delhi Metro Phase IV Silver Line\",\"datePublished\":\"2026-08-01T07:51:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191\"},\"wordCount\":183,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Terratec-Delhi-700x467-1.jpg\",\"keywords\":[\"Delhi Metro\",\"JKumar\",\"TERRATEC\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191\",\"name\":\"Delhi Metro Phase IV Silver Line Records First TBM Breakthrough\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Terratec-Delhi-700x467-1.jpg\",\"datePublished\":\"2026-08-01T07:51:46+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"JKumar Infraprojects achieved the first TBM breakthrough on Delhi Metro Phase IV's Silver Line breakthrough.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Terratec-Delhi-700x467-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Terratec-Delhi-700x467-1.jpg\",\"width\":700,\"height\":467,\"caption\":\"Delhi Metro Phase IV Silver Line breakthrough\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20191#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Terratec TBM makes first breakthrough on Delhi Metro Phase IV Silver Line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Delhi Metro Phase IV Silver Line Records First TBM Breakthrough","description":"JKumar Infraprojects achieved the first TBM breakthrough on Delhi Metro Phase IV's Silver Line breakthrough.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20191","og_locale":"en_US","og_type":"article","og_title":"Delhi Metro Phase IV Silver Line Records First TBM Breakthrough","og_description":"JKumar Infraprojects achieved the first TBM breakthrough on Delhi Metro Phase IV's Silver Line breakthrough.","og_url":"https:\/\/tunnelingworld.com\/?p=20191","og_site_name":"Tunnelingworld","article_published_time":"2026-08-01T07:51:46+00:00","og_image":[{"width":700,"height":467,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Terratec-Delhi-700x467-1.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20191#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20191"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Terratec TBM makes first breakthrough on Delhi Metro Phase IV Silver Line","datePublished":"2026-08-01T07:51:46+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20191"},"wordCount":183,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20191#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Terratec-Delhi-700x467-1.jpg","keywords":["Delhi Metro","JKumar","TERRATEC"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20191","url":"https:\/\/tunnelingworld.com\/?p=20191","name":"Delhi Metro Phase IV Silver Line Records First TBM Breakthrough","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20191#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20191#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Terratec-Delhi-700x467-1.jpg","datePublished":"2026-08-01T07:51:46+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"JKumar Infraprojects achieved the first TBM breakthrough on Delhi Metro Phase IV's Silver Line breakthrough.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20191#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20191"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20191#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Terratec-Delhi-700x467-1.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/08\/Terratec-Delhi-700x467-1.jpg","width":700,"height":467,"caption":"Delhi Metro Phase IV Silver Line breakthrough"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20191#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Terratec TBM makes first breakthrough on Delhi Metro Phase IV Silver Line"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20191"}],"version-history":[{"count":2,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20191\/revisions"}],"predecessor-version":[{"id":20194,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20191\/revisions\/20194"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/20192"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}