{"id":20158,"date":"2026-07-11T07:22:34","date_gmt":"2026-07-11T07:22:34","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=20158"},"modified":"2026-07-11T07:22:47","modified_gmt":"2026-07-11T07:22:47","slug":"madrid-allocates-119m-for-line-11-tunnelling-systems-and-fit-out","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=20158","title":{"rendered":"Madrid allocates $119m for Line 11 tunnelling systems and fit-out"},"content":{"rendered":"<p>Mayrit TBM has connected the excavation fronts between the future Comillas and <a href=\"https:\/\/www.metromadrid.es\/en\/press-release\/2026-06-10\/the-community-of-madrid-completes-the-connection-of-the-tunnel-between-comillas-and-madrid-rio-in-the-extension-of-l11-with-the-arrival-of-mayrit?page=212\">Madrid Madrid Metro Line 11 R\u00edo<\/a> stations, completing a key tunnel link.<\/p>\n<div id=\"attachment_20159\" style=\"width: 778px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-20159\" class=\"wp-image-20159 size-full\" src=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg\" alt=\"\" width=\"768\" height=\"434\" \/><p id=\"caption-attachment-20159\" class=\"wp-caption-text\">\u201cCale\u201d breakthrough links the Comillas and Madrid Metro Line 11 R\u00edo tunnel drives beneath the M-30 and the River Manzanares. Credit: luciezr\/Shutterstock.com.<\/p><\/div>\n<p>The Community of Madrid has earmarked \u20ac104m ($118.6m) for a contract to install equipment required for the operation of the new tunnels and stations being built for the first phase of the Metro Line 11 extension.<\/p>\n<p>The regional administration said the Governing Council received an update on the proposed award from the Regional Ministry of Housing, Transport and Infrastructure.<\/p>\n<p>According to the Community of Madrid, the contract is priced 15% below the base tender amount of \u20ac123m. The package is separate from the main underground civil engineering works and includes electrical and safety installations in the tunneled section, notably overhead catenary systems and a comprehensive fire protection system.<\/p>\n<p>It also covers vertical transportation and passenger circulation systems at the stations, including 29 lifts and 60 escalators, along with other ancillary works.<\/p>\n<p>The systems contract supports construction of the Plaza El\u00edptica\u2013Conde de Casal section, which the government said will be 6.7km long. It reported that overall works on this first section have exceeded 45% completion and remain scheduled for commissioning in 2027.<\/p>\n<p>Progress at individual station boxes varies, with Comillas at around 60% and Madrid R\u00edo at around 58%, while works continue at interchange locations including Atocha, Palos de la Frontera and Conde de Casal.<\/p>\n<p>On the tunnelling programme, a connection has been made between two excavation fronts on the alignment between Comillas and Madrid R\u00edo after the Mayrit tunnel-boring machine (TBM) arrived at the interface.<\/p>\n<p>The Community of Madrid said the breakthrough, known technically as \u201ccale\u201d, completed the tunnel link between the two points and involved passing beneath the M-30 and under the River Manzanares to connect both riverbanks. It said the event marked one of the most significant milestones since construction began and coincided with what it described as the halfway point of the project.<\/p>\n<p>The government reported that since work began on 26 March, Mayrit has excavated 1,116m, which it said represents 21% of the planned route, and has installed 656 rings forming the tunnel\u2019s permanent lining. It added that the machine advances at an average of 15m a day and has occasionally reached 30m a day.<\/p>\n<p>In a separate update, ACCIONA said that, in a joint venture with Dragados and Rover, it has completed excavation of the Comillas\u2013Madrid R\u00edo section. It stated that the tunnel-boring machine reached the future Madrid R\u00edo station after excavating 1,114m in 75 days at an average rate of 15m per day, passing beneath the area around the Manzanares River and the M-30 ring road.<\/p>\n<p>The regional government said the Line 11 extension is intended to create a diagonal Metro route, improving links between neighbourhoods and new urban developments, reducing trip times and cutting down on changes.<\/p>\n<p>It added that the project is expected to help relieve congestion on Line 6, particularly between Plaza El\u00edptica and Avenida de Am\u00e9rica. Works on the wider project began in November 2022 and are scheduled for completion in 2027.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mayrit TBM has connected the excavation fronts between the future Comillas and Madrid Madrid Metro Line 11 R\u00edo stations, completing a key tunnel link. The Community of Madrid has earmarked \u20ac104m ($118.6m) for a contract to install equipment required for the operation of the new tunnels and stations being built for the first phase of the Metro Line 11 extension. The regional administration said the Governing Council received an update on the proposed award from the Regional Ministry of Housing, Transport and Infrastructure. According to the Community of Madrid, the contract is priced 15% below the base tender amount of [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42],"tags":[2729,68],"class_list":["post-20158","post","type-post","status-publish","format-standard","hentry","category-events","tag-metro-line","tag-tunnel","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Madrid allocates $119m for Line 11 tunnelling systems and fit-out Metro - Tunnelingworld<\/title>\n<meta name=\"description\" content=\"Madrid has allocated \u20ac104m for Metro Line 11 extension systems and station fit-out as tunnelling passes a key milestone.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=20158\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Madrid allocates $119m for Line 11 tunnelling systems and fit-out Metro - Tunnelingworld\" \/>\n<meta property=\"og:description\" content=\"Madrid has allocated \u20ac104m for Metro Line 11 extension systems and station fit-out as tunnelling passes a key milestone.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=20158\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-11T07:22:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-11T07:22:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"434\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Madrid allocates $119m for Line 11 tunnelling systems and fit-out\",\"datePublished\":\"2026-07-11T07:22:34+00:00\",\"dateModified\":\"2026-07-11T07:22:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158\"},\"wordCount\":540,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Image-1-1.jpg\",\"keywords\":[\"Metro Line\",\"Tunnel\"],\"articleSection\":[\"Events\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158\",\"name\":\"Madrid allocates $119m for Line 11 tunnelling systems and fit-out Metro - Tunnelingworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Image-1-1.jpg\",\"datePublished\":\"2026-07-11T07:22:34+00:00\",\"dateModified\":\"2026-07-11T07:22:47+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"description\":\"Madrid has allocated \u20ac104m for Metro Line 11 extension systems and station fit-out as tunnelling passes a key milestone.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Image-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Image-1-1.jpg\",\"width\":768,\"height\":434,\"caption\":\"\u201cCale\u201d breakthrough links the Comillas and Madrid R\u00edo tunnel drives beneath the M-30 and the River Manzanares. Credit: luciezr\\\/Shutterstock.com.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=20158#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Madrid allocates $119m for Line 11 tunnelling systems and fit-out\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Madrid allocates $119m for Line 11 tunnelling systems and fit-out Metro - Tunnelingworld","description":"Madrid has allocated \u20ac104m for Metro Line 11 extension systems and station fit-out as tunnelling passes a key milestone.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=20158","og_locale":"en_US","og_type":"article","og_title":"Madrid allocates $119m for Line 11 tunnelling systems and fit-out Metro - Tunnelingworld","og_description":"Madrid has allocated \u20ac104m for Metro Line 11 extension systems and station fit-out as tunnelling passes a key milestone.","og_url":"https:\/\/tunnelingworld.com\/?p=20158","og_site_name":"Tunnelingworld","article_published_time":"2026-07-11T07:22:34+00:00","article_modified_time":"2026-07-11T07:22:47+00:00","og_image":[{"width":768,"height":434,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=20158#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=20158"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Madrid allocates $119m for Line 11 tunnelling systems and fit-out","datePublished":"2026-07-11T07:22:34+00:00","dateModified":"2026-07-11T07:22:47+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20158"},"wordCount":540,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20158#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg","keywords":["Metro Line","Tunnel"],"articleSection":["Events"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=20158","url":"https:\/\/tunnelingworld.com\/?p=20158","name":"Madrid allocates $119m for Line 11 tunnelling systems and fit-out Metro - Tunnelingworld","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=20158#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=20158#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg","datePublished":"2026-07-11T07:22:34+00:00","dateModified":"2026-07-11T07:22:47+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"description":"Madrid has allocated \u20ac104m for Metro Line 11 extension systems and station fit-out as tunnelling passes a key milestone.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=20158#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=20158"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=20158#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2026\/07\/Image-1-1.jpg","width":768,"height":434,"caption":"\u201cCale\u201d breakthrough links the Comillas and Madrid R\u00edo tunnel drives beneath the M-30 and the River Manzanares. Credit: luciezr\/Shutterstock.com."},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=20158#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Madrid allocates $119m for Line 11 tunnelling systems and fit-out"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20158"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20158\/revisions"}],"predecessor-version":[{"id":20160,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/20158\/revisions\/20160"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}